湛江海湾大桥

  • 网络Zhanjiang Bay Bridge
湛江海湾大桥湛江海湾大桥
  1. 湛江海湾大桥水中引桥采用跨度50m的预应力混凝土连续箱梁,采用移动模架系统现浇施工。

    The offshore approach spans of Zhanjiang Bay Bridge are designed to use 50-m span prestressed concrete continuous box girders that are to be cast in situ with slide shuttering system .

  2. 湛江海湾大桥主桥是主跨480m的混合梁斜拉桥。

    The main bridge of Zhanjiang Bay Bridge is a composite cable-stayed bridge with a central span of 480 meters .

  3. 介绍了在广东湛江海湾大桥施工控制网测量中GPS技术、宽水域跨河水准测量技术的应用情况。

    This paper mainly discusses the application of GPS technology , leveling over wide-area of waters in the building of the construction control net .

  4. 广东湛江海湾大桥施工控制网测量

    Construction Control Net of the Bay Bridge in Zhanjiang Guangdong

  5. 湛江海湾大桥移动模架监测

    Monitoring of Slide Shuttering System of Zhanjiang Bay Bridge

  6. 湛江海湾大桥钢箱梁安装施工

    Introduction to Construction of Steel Box Girder of Zhanjiang Bay Bridge and Experience

  7. 建设中的广东湛江海湾大桥索梁锚固采用锚拉板结构。

    The Zhanjiang Bay Bridge applies the Cable-girder anchorage with tensile anchor plate .

  8. 湛江海湾大桥抗震性能分析

    Analysis of Aseismic Capacity of Zhanjiang Bay Bridge

  9. 桩基承载力自平衡测试法在湛江海湾大桥中的应用

    Self-balanced Loading Test Method in Zhanjiang Bay Bridge

  10. 湛江海湾大桥锚拉板式索梁锚固区疲劳试验

    Fatigue Test of Tensile Anchor Plates in Cable-Beam Anchorage Zones for Zhanjiang Gulf Bridge

  11. 湛江海湾大桥钢箱梁结构特点及关键制造工艺方案

    Structural Features and Key Fabrication Workmanship Scheme for Steel Box Girders of Zhanjiang Bay Bridge

  12. 湛江海湾大桥48号主墩超长大直径桩基施工

    Construction of Long and Large Diameter Bored Piles of Main Pier No.48 Foundation of Zhanjiang Bay Bridge

  13. 湛江海湾大桥是跨越麻斜海湾的五跨连续漂浮体系混合梁斜拉桥。

    Zhanjiang Bay Bridge is a 5 span continuous composite cable stayed bridge of floating system across Maxie straits .

  14. 对湛江海湾大桥索梁锚固结构进行疲劳试验设计,并结合已完成的试验总结疲劳试验设计应遵循的一些规律。

    The fatigue test model of the Zhanjiang Bay Bridge is designed , and some rules about the fatigue test are summarized .

  15. 湛江海湾大桥主桥为双塔双索面混合梁斜拉桥,跨径组合为60m+120m+480m+120m+60m。简要介绍了湛江海湾大桥主桥斜拉桥钢箱梁的安装流程,并总结了部分经验,供今后类似工程施工借鉴。

    This paper presents the construction process of steel box girder of main bridge of Zhanjiang Bay Bridge , and provides helpful experiences for construction of similar bridges .

  16. 通过气弹全模型试验对斜风作用下湛江海湾大桥裸塔抖振响应性能进行了研究。

    The buffeting performance of the free-standing tower of Zhanjiang Bay Bridge , a long-span cable - stayed bridge , under yaw wind is investigated by means of wind tunnel test of aeroelastic full model .

  17. 为评估湛江海湾大桥锚拉板式索梁锚固结构关键构造细节的疲劳性能,对该结构进行了足尺模型疲劳试验。

    In order to assess the fatigue performance of the key connection details of tensile anchor plates in cable-beam anchorage zones , a full-scale model fatigue test of the tensile anchor plates of Zhanjiang gulf bridge was conducted .

  18. 结合湛江海湾大桥主墩施工,介绍沿海地区在水深浪大的恶劣环境下,进行大直径、超长钻孔桩施工的施工工艺。

    With reference to the construction of the main pier foundation of Zhanjiang Bay Bridge , the technology for construction of long and large diameter bored piles in hash environment of deep water and violent waves in the coastal area are described .

  19. 根据湛江海湾大桥连接线一期工程某些填方路段出现龟裂的情况,进行了试验分析并提出了相应措施。

    According to the situation that the map cracking appears in some fill section in the first stage construction of the connecting line of bay bridge in Zhanjiang City , this paper makes the experimental analysis on it and advances some corresponding measures .