混凝土浇筑
- 网络Concreting;concrete placement;placing concrete
-
混凝土浇筑之前应对管道进行水密检查。
Ducts shall be checked for water tightness before concreting .
-
温度应力计算时应考虑混凝土浇筑时间的不同、后浇带的设置对温度应力的影响。
While calculating the thermal stress , the influence of concreting time and the arrangement of post-pouring belt on the thermal stress should be considered .
-
PLC在龙滩大坝混凝土浇筑温控系统中的应用
PLC Temperature Control Systems in the Project of the Dam of Longtan Hydropower Station
-
用ANSYS程序估算混凝土浇筑块自生体积变形应力
Estimation of Concrete Block Self-generating Volumetric Deformation Stress by Use of ANSYS Program
-
通过有限元方法,研究外掺MgO混凝土浇筑块温度应力的时空效应,比较了不同部位、不同浇筑层MgO掺率对温度应力的影响。
The effect of the thermal stress of concrete mixed MgO pouring block was studied .
-
楼板混凝土浇筑板面标高控制技术场地标高优化和土方量计算及其ExcelVBA的程序实现
Elevation control technology for cast-in-place concrete floor Site Elevation Optimization & Earthwork Volume Calculation and Excel VBA Program Realization
-
分析了影响混凝土浇筑系统的因素之间的关系,建立了浇筑系统的SD模型,并对该系统进行了模拟,得出了一些有意义的成果,对工程施工具有一定的参考价值。
Based on analysis of factors influencing the concrete placement system , SD model for placement system is established and used in simulation . Some meaningful results are got , which may be as reference to similar works .
-
MNC-A3高效早强剂在混凝土浇筑工程中的应用
Application of MNC-A3 High-performance Early Strengthening Agent in Concrete Casting Works
-
高温不稳定多年冻土区天然地温较高,桩身混凝土浇筑18d后,桩身首先在桩底处出现负温(-0.18℃)。
However , in the high temperature unstable region , negative temperatures ( -0.18 ℃) first occurred at the bottom of pile after 18 days .
-
三峡大坝泄1~23号坝段45m高程施工栈桥,承担着初期大坝混凝土浇筑、辅助构件转运以及金结安装等工作。
45 m construction trestle for No. 1 ~ No. 23 flood releasing dam sections of TGP undertakes initial stage dam concrete placement , conveyance of auxiliary elements and metal structure erection etc.
-
介绍了MNC-A3高效早强剂在某小区混凝土浇筑工程中的应用状况及应用效果。
This paper introduces the application situation and application results of MNC-A3 high-performance early strengthening agent in concrete casting works of a certain housing estate .
-
采用组合式排架支撑和叠合梁形式的混凝土浇筑工艺,完成了离地34.5m的大跨度斜交巨型梁的施工。
By the adoption of built-up bent-frame bracing and laminated-beam-like concreting , the construction of extra-large skewed beam with 34.5m high above ground and large span was successfully completed .
-
桥梁冲击钻孔桩钻进及混凝土浇筑问题的处理
Disposal of problems in bridge-impact drilling pile and concrete irrigating construction
-
施工期混凝土浇筑块的脆弹性徐变应力分析
Brittle-Elastic Analysis of Stresses in Pouring Blocks of Concrete under Construction
-
大坝混凝土浇筑块排序方法的评价研究
Study on the Assessment of Sequencing Concrete Grouting Blocks on Dam
-
大体积混凝土浇筑裂缝控制要点浅析
Analysis on key points for cracks ' control of mass concrete
-
连续箱梁施工阶段混凝土浇筑误差调查分析
On errors investigation in concrete grouting at connecting box girder construction
-
浅谈泵送商品混凝土浇筑的楼板裂缝预防及处理
Prevention and Treatment of Crack in Slab Cast by Ready-made Concrete
-
三峡大坝混凝土浇筑系统计算机仿真软件开发研究
Study of the Simulation-software Development on the Three Gorges Concrete Dam Construction
-
闸门门槽埋件一次混凝土浇筑的方法研究
Research on the method of once pouring concrete for STROBE-SLOTE embedded parts
-
在混凝土浇筑的过程中,施工人员需要随时监控混凝土的内部温度。
The builders need monitoring the temperature inside the concrete .
-
混凝土浇筑路径与模板支撑体系内力响应
Relation Between Concrete Placing Route and Formwork Supporting System Response
-
重力坝和混凝土浇筑块的温度应力
The thermal stresses in gravity dams and massive concrete blocks
-
混凝土浇筑质量对钢管混凝土性能的影响
Effect of Pouring Quality of Concrete on Performance of Steel Tube Concrete
-
拱坝混凝土浇筑分层分块计算机辅助设计
The Computer Aided Design for Layers and Blocks of Arch Dam Construction
-
碾压混凝土浇筑层温度场计算模型研究
Study on calculation model for temperature field of roller compacted concrete lifts
-
混凝土浇筑块基岩应变观测方法
A new strain observation method for bedrock under placed concrete
-
混凝土浇筑质量控制的旁站监理
Construction Site Supervision of Quality Control in the Concrete Casting
-
一项高科技成果在三峡工程中的应用&三峡二期工程大坝混凝土浇筑过程模拟系统
Concrete Placement Process Simulation System for Phase - ⅱ Works
-
大体积混凝土浇筑的模板侧压力
The Pressures Acting on the Form for Mass Concrete Pouring