涌水

  • 网络Water
涌水涌水
  1. 新型FBG渗压传感器在隧道涌水模型中的应用

    Application of a novel fiber-optic grating seepage pressure sensor in tunnel water gushing model

  2. 汕头LPG工程交通洞注浆堵涌水纪实

    Practical experience of flood protection by grouting for gushing water in a communication cavern of LPG engineering project at Shantou City

  3. 基于AHP的岩溶隧道涌水专家评判系统及其应用

    Professional evaluating system for karst tunnel gushing based on AHP and its application

  4. 注浆技术在处理越南冒溪煤矿FA断层涌水冒落事故中的应用

    Grouting Technology Applied to Water Inrush and Roof Falling Accident in FA Fault of Mao Khe Coal Mine , Vietnam

  5. 秦岭隧道出口段突涌水特征及对TBM施工的影响

    Character of Sudden Water Inflow in the South Section of Qinling Tunnel and Its Influence on TBM Construction

  6. 矿井涌水水源识别的MMH支持向量机模型

    MMH support vector machines model for recognizing multi-headstream of water inrush in mine

  7. 高分辨V6系统在矿山顶板涌水隐患中的应用研究

    An applied study on prevention of water bursting disaster in mines with the high resolution V6 system

  8. 基于这五种因素与隧洞涌水量之间的关系,构建了基于BP神经网络方法的富水区大埋深高渗压隧洞涌水预测模型。

    Based on the relationship between these five factors and tunnel water gushing ," the prediction model of hydraulic tunnel water gushing with water-rich area large buried depth and ultra-high osmotic pressure " is established by BP neural network method . 3 .

  9. 本文主要分析了F3断层突发性涌水机理,介绍了F3断层突涌水的治理措施。

    The analysis is made of mechanisation for burst water on Fault F3 and an introduction is given to treatment measures for the gushed water in this paper .

  10. 文章运用有限差分软件(FLAC3D)对厦门海底隧道F4风化深槽的涌水情况进行了流固耦合分析。

    The fluid-mechanical analysis on water inflow capacity in Xiamen subsea tunnel was carried out by the finite differences software FLAC ~ ( 3D ) .

  11. 山东文登抽水蓄能电站在探洞开挖至400m处,遇到断层带,并发生涌水问题,造成部分洞段出现塌方。

    When the testing tunnel for Wendeng Pumped Storage Power Station in Shandong province is excavated to 400m , a fault zone crosses the tunnel and water inrush occurred , which induced the collapse .

  12. 在隧道穿凿的过程中常常遭遇各种不良地质体,如岩石破碎带、溶洞、突泥涌水等,瞬变电磁法(TEM)就是为了解决该问题而引入的一种隧道超前预报技术。

    During the tunneling we faced varieties of harmful geological objects frequently , such as rock fracture zones , karst caves , water outburst quick mud , then Transient Electromagnetic Method ( TEM ) is a method of advanced geological forecast of tunnel to solve the problems .

  13. 最后应用时间序列分析频谱方法研究了31年来矿井涌水量对降雨量的响应关系,即全矿涌水量滞后于降雨6d。

    Finally , author deals with the response relationship between water yield in the mine and precipitation in past 31 years used frequency analysis of time series and reach a conclusion that the retardation time between water yield and precipitaion is 6 days .

  14. 采用单指标评价法,以《地表水环境质量标准》(GB3838-2002)的Ⅲ类地表水标准值作为评价水体是否超标的判定值,矿井涌水水质的化学需氧量超标4倍,氟化物超标2.2倍。

    Using the single indicator evaluation and the third kind of surface water standard value determined by " Surface water Environment Quality Standard " ( GB3838-2002 ), the chemical oxygen demand of mining water exceeded 4 times of the allowed figure and fluoride 2.2 times exceeded the allowed figure .

  15. 关于深埋长隧洞开挖中高压涌水问题的讨论

    Discussion for High - Pressure Blow of Deeply Buried Long Tunnels

  16. 岩溶充水隧道涌水量系数的探讨

    Inquiry on coeficient of gushing water quantity of karst water tunnel

  17. 三阳隧道特大涌水病害综合治理措施

    Measures for Comprehensive Treatment of Extra Gushing Water-Disease at Sanyang Tunnel

  18. 岩体温度法隧道施工掌子面前方涌水预测预报探讨

    Predicting water-inflow from the face of a tunnel by geothermal measurement

  19. 岩溶水快速流与某些地下洞室涌水的关系

    Relation of Rapid Carst Water Flow with Some Underground Cavern Outgush

  20. 论铁路隧道涌水灾害的防治

    On prevention and control of water gushing hazard in Railway Tunnels

  21. 灰色控制与矿井最大涌水量计算

    Grey Control and the Calculation of Maximum Groundwater Discharge for Mining Wells

  22. 矿井涌水量中的混沌及其最大预报时间尺度

    Chaos in mine discharge and its maximum predictable time scale

  23. 深埋岩溶隧道涌水最大水头压力评估

    Hydraulic head pressure forecasting of water gushing for tunnel with thick overburden

  24. 注浆技术在治理烧变岩区煤层涌水中的应用

    Application of Grouting in Burnt Rock Zone Coal Bed Water Inrush Control

  25. 大涌水地段的接触网基础施工

    The Construction of OCS System Groundwork in The Bigger Gushing Water District

  26. 利用涌水的公路隧道消防供水系统

    Water inflow into highway tunnels utilized for the water supply of fire-fighting

  27. 抚顺老虎台矿治理井筒涌水的新方法

    New Methods about Shaft Water Inrush Control of Laohutai Mine

  28. 涌水量与降深曲线类型的判别及求参程序

    Discrimination of water inflow-drawdown curves and establishment of parameter program

  29. 钻孔灌注桩塌孔、涌水的处理

    The Handling of Subsidence and Gushing Water in Drilling Hole Pour Pile

  30. 黄土公路隧道涌水量估算

    Estimation on Outflow of Water for Loess Road Tunnel s