工程签证

  • 网络Engineering visa;Project Visa
工程签证工程签证
  1. 基于清单计价模式的工程签证管理对策研究

    Countermeasures of Project Visa Management Based on List Valuation Model

  2. 浅谈现场工程签证在预结算中的重要作用

    Discussion on Important Role on-site Project Visa in Budget and Final Account

  3. 如何加强设计变更和工程签证的管理工作

    Measures to strengthen the management of design alternation and project license

  4. 严格工程签证管理的实践与思考

    Practice and Consideration of Strict Management of Construction Inspection Verification

  5. 承包商则应从完善工程签证的管理制度、建立合同交底记录制度等方面加强管理。

    The contractor should consummate the visa management system .

  6. 论建设工程现场签证管理

    On Site Visa Management of the Construction Project

  7. 工程量签证的几点体会

    Some experience on confirmation of quantity of works

  8. 浅谈承包方在建设工程中的签证与索赔策略

    Brief Discussion on Visa and Compensation Strategies for Contractors in Construction Engineering

  9. 浅议工程变更、现场签证的控制

    On Control of Engineering Permutation & Position Visa

  10. 工程费用联系单签证有关问题的分析与处理

    Analysis and Management of the Problems Related to Attestation of the Contact Note of Engineering Cost

  11. 为此,美国国务院做出了政策调整,延长了科学和工程专业学生的签证有效期,并提高了工作人员的水平能力,以减少签证办理时间。

    The state department responded by revamping its policy , extending visas for science and engineering students and increasing staff levels to shorten visa processing times .

  12. 投资控制是监理工作的一项主要内容,在施工阶段,监理工程师要搞好工程变更、现场签证的审查确认工作,做好投资控制。

    Invest control is one partial contents note of control working . In execution stage , control engineer is about to make good inquiring validation invest control of engineering permutation position visa .

  13. 分析了造价监理工程师如何在在施工前期的招投标、施工组织方案技术经济评价和工程施工阶段的签证、索赔、进度款控制等方面对造价进行合理确定和有效控制。

    This paper expounded how the cost inspecting engineers rationally determine and effectively control the cost of project in bidding , organizing techno - economic evaluation on construction plan in the earlier stage , signing and proving , claiming , control of progress payment in the construction stage .

  14. 浅谈建筑工程施工阶段工程变更签证管理

    Shallowly Discussion of the Project Variation Visa Management in Architectural Engineering Construction Stage

  15. 本文介绍了隐蔽工程施工现场准确测量签证及工程量准确审核签证的具体方法。

    This paper introduces the concrete methods of accurate measuring visa in occult engineering field and accurate cheeking and approving visa of engineering quantity .

  16. 因此,施工阶段投资控制的工作重点放在控制工程变更、限制工程签证、加强甲供材料管理等。

    Therefore , we should focus on controlling the investment of engineering change , limiting work visas , strengthening of material supplied by management .

  17. 浅析工程中设计变更与工程量签证单

    Simple Analysis of Design Alteration and Engineering Visa

  18. 实行工程量清单报价后,工程变更及其签证费用的审计是工程结算审计的关键。

    After carrying out engineering quantity list , engineering alteration and the expenses is the key of engineering balance audit .

  19. 在工程施工实施阶段,严格合同管理和工程变更签证管理;

    During the project implementation , strict managements of the contract and visa of the project variation are necessary .