单价合同

  • 网络unit price;Unit Price Contract;unit rate contract
单价合同单价合同
  1. 在国际承包工程中,通常采用FIDIC条件下的单价合同,这类合同一般以承包商实际完成的工程量计算工程价款。

    In international undertaking contracted projects , the unit price contract is widely used under the FIDIC conditions . Generally speaking , this kind of contract accounts the cost of projects according to actual amount of work done by the contractor .

  2. 单价合同将成为工程承包计价方式发展的必然趋势。

    But unit price contract will be the main way in the future development .

  3. FIDIC编写的土木工程施工合同条件属于单价合同,它强调量价分离。

    The " civil engineering construction contract condition " compiled based on the FIDIC , which is a contract at the unit price , lays the emphases on the " separation of the quantities and the prices " .

  4. 国际工程固定单价合同中的工程量清单

    On bill of quantities applied in fixed-price contract in overseas construction

  5. 公路工程单价合同中变更单价的确定方法

    The Confirmation Method for Unit Price in Construction Alteration

  6. 公路工程单价合同标价编制的现状及问题

    Actuality and exist problems of unit price contract marked price in road project

  7. 目前工程承包计价方式有总价合同,单价合同,成本加酬金合同;

    At present , there are three ways of project contract pricing , total price contract , unit price contract and cost plus compensation contract .

  8. 固定单价合同被广泛地运用于国际工程承包,工程量清单是这种承包方式估价、计价体系的灵魂。

    Price-fixed contract is widely used in the overseas construction contracting , and bill of quantities is the vital part in the price valuation of such constructions .

  9. 在返工成本率指标上,竞争性投标总价合同与单价合同在0.05的显著性水平上存在显著性差异。

    At the significance level of 0.05 , the mean values of the rate of cost overran is significantly different between lump sum through competitive bidding and unit price .

  10. 工程量合同:单价合同的一种类型,带有在咨询工程师或建筑师的计划的基础上计算出来的详细量单。

    Bill of quantities contract : A type of unit price contract , with a detailed Bill of quantities calculated on the Basis of the plans of the consultant engineer or architect .

  11. 当前我国在招投标中,执行单价合同在标价计算过程中存在建筑市场的竞争、材料价格的不一、时间性的差异等问题。

    It was transact unit price contract in our country invite bidding and bid at present it have following problems during bid price calculate process : compete from architecture market , price was not uniform and have different on time .

  12. 合同的应用条件,计价应注意的事项,付款应注意的问题,分析了固定总价合同的风险分配,固定总价合同与单价合同的区别。

    Then the applied conditions , some items notable in costing , and some problems in payments are introduced . Moreover , the risk allocation in fixed price contract is analyzed , and the difference between fixed price contract and unit price contract is identified .

  13. 通过实例,探讨了在铁路工程施工中,建设单位与施工单位就工程签订的单价合同和可调总价合同两种合同方式的情况下,在工程竣工后,工程竣工决算的编制方法。

    This article discusses the making method of final statement at completion of project by elaborating on such two types of contracts as " unit price contract " and " lump sum adjustable contract " singed by the owner and the contractor during the construction of railway engineering .

  14. 商品的数量和单价在每份合同中都有详细规定。

    The quantity and the unit price are stipulated in each contract .