保证了地铁站、五棵松桥及暗涵结构的安全,使地铁站提前半年解除限速。
With the application of the results of this study , the safety of subway stations , Wukesong Viaduct and the buried culvert are ensured , and the speed limit of subway have been relieved up to six month in advance .