三峡升船机
-
针对三峡升船机顶部厂房产生的地震鞭梢效应,利用dSPACE和Matlab/Simulink工具,建立屋盖智能隔震升船结构的控制方程和试验控制系统。
The control equation and experimental system of roof MR intellectual isolation system have been built according to the whiplash effect of the roof of the Three Gorges ship-lifting structure by dSPACE and Matlab / Simulink tools .
-
三峡升船机结构关键技术研究
Researches on Structural Cruxes of the Vertical Ship Lift in TGP
-
三峡升船机传动系统静动态受力的研究
Study on static and dynamic forces on the THREE-GORGES lifter drives
-
用地质力学模型研究三峡升船机上闸首基础稳定问题
Investigation into Foundation Stability of Ship lift 's Upper Head for TGP
-
长江三峡升船机运行状态故障诊断
Fault Diagnosis of the Three Gorge Ship Lift Running State
-
三峡升船机传动系统虚拟样机设计
Virtual Prototyping Design for Ship-lift at Three Georges Project
-
三峡升船机上闸首的自振特性分析
Free Vibration Characteristics Analysis of the Head-Bay of the Three Gorges Ship Lift
-
三峡升船机卷扬提升系统和液压平衡系统的动态耦合分析
Dynamic Coupling Analysis on the Lift System and Hydraulics System of Three Gorges Shiplift
-
基于几何法的三峡升船机卷筒强度的可靠性分析
Geometric method for the reliability analysis of the drum in the three-georges ship elevator
-
三峡升船机塔柱底部实体混凝土结构温度配箭研究
Study of Temperature Reinforcement of Mass Concrete in Tower-column Structure in the Three-Gorges Ship-lift
-
三峡升船机结构简化力学模型
Reduced Mechanical Model of Three-Gorges Lift-ship Structure
-
三峡升船机船厢失水事故动态特性研究
Study on dynamic properties of ship-lift during water-losing from ship chamber of Three Gorges Project
-
三峡升船机塔柱筒体结构温度配筋研究
A Study on Temperature Reinforcement of Tube-Structure of Ship Lift for the Three Gorges Project
-
三峡升船机承船厢浅水船波自然频率的研究
Natural Frequencies of Shallow Water Waves in the Ship Reception Chamber of a Ship Lift
-
三峡升船机钢丝绳断丝与磨损检测原理及实现
Principle and Realization of Testing of Broken Wires and Wear of Sanxia Ship lifting Wire Ropes
-
三峡升船机卷筒强度分析的精细方法
An Accurate Method for the Reliability Analysis of the Drum in Three - Gorges Ship Elevator
-
三峡升船机船-水-厢耦合系统的非线性有限元时域计算
Calculation of ship-water-chamber coupled system in the ship lift with finite element method in time domain
-
对三峡升船机上闸首下沉式工作闸门布置进行研究。
The layout of upper head with lowering working gate of Three Gorges ship lift is studied .
-
三峡升船机上闸首结构抗震分析研究
Earthquake-resistant analysis and study on the upper lock head structure of ship lift for Three Gorges Project
-
三峡升船机塔柱联系梁三维有限元内力计算翼内升力风扇式垂直起落飞机
Internal Force Calculation of Crossbeams of Three Gorges Project Ship Lift Tower with 3D FEM fan-in-wing VTOL
-
目前,三峡升船机引入德国技术,拟采用齿轮齿条爬升机构、长螺母柱短螺杆安全机构。
It is supposed to introduce the technology of gear-rack driven mechanism and nut-screw safety mechanism from Germany .
-
三峡升船机为单线一级钢丝绳卷扬全平衡式垂直升船机。
The Three Gorges vertical ship lift is of single-way , one-stage , cable hoist and full-balanced type .
-
最后,本文通过大量数值计算和实验数据分析,给出了一些较有意义的结果,以供三峡升船机工程设计参考。
Last , many numerical calculations of the above work were performed and some interesting results were given .
-
三峡升船机塔柱结构的动力试验与抗震分析
Dynamic Test and Vibration Analysis of the Column Structures of the Ship lift Tower of the Three Gorge Project
-
三峡升船机上闸首闸顶排架的抗震分析
Earthquake resistance analysis of the framed bent on the top of lock head of the Three Gorges project ship lift
-
三峡升船机上闸首结构动力试验研究及数值分析
Dynamic test research and numerical analysis for upper floodgate head structure of rising ship machine in three Strait of Yangtze River
-
三峡升船机塔柱链孔部分光弹性研究
Photoelasticity Study on the Part of Chain Hole in the Column of Vertical Ship lifting Machine of the San Xia Dam
-
三峡升船机的水动力计算通过低水压下管网的水力计算,来模拟故障时和关阀后的水力工况。
Hydro dynamics status when the accident of urban water supply network happens or after valve shutdown are simulate by hydrodynamic calculations of network with lower hydro-pressure .
-
三峡升船机提升系统是由多个子系统组成的复杂系统,其中有传动机械、船厢、水体、客轮、钢丝绳和调平油缸等。
Ship lift system is a very complex system , which consists of driving machine , water chamber , water , ship , cable and so on .
-
本文研究的是三峡升船机中船在进出承船厢时的附加质量问题,该问题是属于物体在有限域中运动的附加质量问题。
In the paper we studied the added mass of the ship when entering and leaving the chamber of the ship-lifter of Three Gorges project , based on a 3D model .