bcwp

  • 网络已完工作预算费用;赢得值;预算成本;已完成工作预算成本;已完成工作量的预算成本
bcwpbcwp
  1. Last , we solved the schedule fluctuate through P3 software and BCWP theory .

    最后运用P3以及BCWP的方法解决了项目管理中的计划波动问题。

  2. This thesis designs a complete and practical model of cost control in the process of project , discusses how to use Budgeted cost if work performed method ( BCWP ) accurately got cost control in the process project implement at any time .

    本文设计了一套完整而实用的项目实施过程中的成本控制模式,论述了在项目实施中任何时点如何正确应用挣值分析法进行成本控制。

  3. It 's brought forward an EVM evaluation method with critical path to hold the project progress well through comparing with BCWP and BCWS also with BCWP CP and BCWS CP in critical path at the same time .

    本文提出了一种带关键路径的挣值法评价方法,在比较分析BCWP与BCWS的同时对关键路径上的BCWP与BCWS作比较,以便更准确地把握项目进度情况。