新建铁路
- 名newly-built railway
-
新建铁路方案比选的理论与方法
Research on theory and methods of scheme comparison for newly-built railway construction
-
新建铁路道床质量状态参数试验分析
Test Analysis on the Quality State Parameter of Newly-Built Railway Ballast Bed
-
关于编制新建铁路GPSRTK测量技术规程的建议
Suggestions on Drawing up Technical Regulations for GPS RTK Surveying of the Newly Built Railways
-
某新建铁路复杂长隧道岩层地质与CSAMT特征
Geology and CSAMT character of long complex railway tunnel
-
新建铁路工程测量规范经济预测与规划中心
Code for new railway engineering survey Economic Projections and Programming Centre
-
新建铁路开通速度目标值经济可行性分析
Economical Feasibility Study on Target Speed Value of Newly Opened Railways
-
新建铁路项目可持续发展指标体系及综合评价
Sustainable development index system of new railway project and its comprehensive evaluation
-
铁路跨线桥(铁路线在上)新建铁路干线一次铺设跨区间无缝线路技术
Railroad overbridge Constructional technology of laying a new rail link between cross-CWR
-
新建铁路桥梁施工前技术准备工作
Technical preparatory works before construction of bridge in a newly built railway
-
新建铁路复线大量石方控爆技术
The Vast Controlled Rock Blasting Technology of New Double-line Railway
-
新建铁路定测方法研究
Study on the Location Survey Method of Newly Built Railway
-
新建铁路客运站房暖通空调设计综述
Review on HVAC system design of new railway passenger stations
-
新建铁路工程使用材料价差调整办法探讨
Discussion about usage of material price difference adjusting method in new railway project
-
新建铁路对城市噪声的影响特点及其噪声预测方法
Characteristics of Urban Noise Impact by Newly Built Railway and Noise Prediction Method
-
新建铁路隧道动态设计系统的构思
A Concept of Dynamic Design System for New Tunnels
-
新建铁路基本走向决策支持系统
The fundamental trend decision support system for new railway
-
新建铁路中线桩测设的实用方法
A Practical Method of Centerline Stake Setting Out in Construction of New Railway
-
新建铁路项目中竣工资料的收集、整理与编制
The Collection , Sorting and Drafting of Completion Data in Newly Built Railway Projects
-
新建铁路专用线声环境影响评价的程序与方法
The process of noise environmental impact assessment on a newly built special railway line
-
新建铁路石方路堑峒室松动爆破
Cavern Loosening Blasting in New Railway Rock Cutting
-
新建铁路前期工作智能辅助决策系统的研究
Study on AI Aided Decision System for Pre work of New Railway Engineering Construction
-
新建铁路社会效益计算方法的探讨
Probe into the Calculation Method in Assessing the Social Benefit of New Railway Line
-
新建铁路摄影测量规范
Code for photogrammetric survey of new railway lines
-
浅析新建铁路曲线区段接触悬挂的计算条件
Discussion on the Computing Conditions of the Catenary Suspension in the Railway Curved Section
-
新建铁路重庆&怀化区域计算机联锁系统可行性研究
Feasibility Study for the Regional Computer Interlocking System of the New Chongqing - Huaihua Railway
-
《新建铁路工程测量规范》修订原则及技术特点
Revise Principles and Technical Characteristics of " Code for the Engineering Survey for New Railway "
-
新建铁路用地优化的研究某单线铁路隧道的稳定性分析
On the Land-using Optimization of Railroad Construction STUDY ON STABILITY 0F A SINGLE TRACK RAILWAY TUNNEL
-
新建铁路洛湛线永州&玉林段绿化工程优化设想
Optimization plan for the afforestation project between the Yongzhou-Yulin section of the new Luoyang-Zhanjiang railway line
-
新建铁路工程测量规范
Code for new railway engineering survey
-
新建铁路站区对城市环境噪声影响特征及预测研究
Characteristic of the Impact of Newly Built Railway Station on Urban Environment Noise Level and Its Prediction