成都东站

  • 网络Chengdu East Railway Station
成都东站成都东站
  1. 介绍了成都东站扩建工程的概况,成都粘土对工程结构物(路基)的危害,分析了石灰与土的反应机理。

    This paper simply introduces the extension project of Chengdu East Railway Station , the harm of Chengdu clay on constructions ( such as subgrade ), and the reaction between lime and soil .

  2. 通过分析成都东站的客流特征和换乘需求,对站内换乘系统有效性和与其他交通运输方式的匹配性进行评估。三、设备能力评估。

    Through analyzing passenger flow characteristics and transfer requirements of Chengdu East Railway Station , the author conducts assessment of the effectiveness of the transfer systems and the matching with other transportation mode . 3 .

  3. 在第二阶段中,通过旅客问卷的方式对上海虹桥站以及成都东站站内的公共设施进行了调研,并以观察分析的结果作为数据分析结果的补充。

    In the second stage , through the questionnaire on Shanghai Hongqiao passenger station and Chengdu East Station of public facilities in the research , and to observe the analysis results as additional data analysis results .