升压站
- 网络Booster station;boost leg
-
嘉兴电厂二期工程500KVGIS升压站安装
Installation of 500 kV GIS Booster Station of Jiaxing Power Plant , Phase II
-
根据升压站实时数据监测需求,开发了基于B/S多层结构的WebGIS,建立了风电场升压站综自实时监测系统。
According to the information management needs of wind farm , we develop B / S multilayer structure Web GIS , establish real-time supervisory system of the booster station integrated automation system .
-
目前省级调度中心均已建设了EMS能量管理系统,用于电网的监控与调度管理,但不具备风电场监控功能,监控范围只限于风电场接入电网的升压站。
Currently the EMS energy management system has been built in the provincial dispatch center , which is used for power grid monitoring and dispatch management .
-
神头二电厂500kV升压站线路断路器取消合闸电阻可行性论证分析
Feasibility of 500 kV Voltage step-up Station Line Breaker Remove Switch-on Resistance
-
220kV升压站“五防”闭锁装置改进与探讨
Improvement and Discussion of " Five-prevention " Interlock Devices in 220 kV Step-up Substations
-
提出了改进的短路点设置新方法:即GIS升压站以接地刀闸代替短路铜排,或以接地刀闸与短路排组合设置短路点。
The new setting methods of the short-circuit point are presented in this paper , which substitute the grounding switch for the short circuit , or combine the grounding switch and the to be the short-circuit point in the GIS station .
-
关于500kV升压站支柱绝缘子污闪防治的探讨
Some Discussion on Prevention and Control of Pollution Flashover Caused by Post Insulator in 500 kV Step-up Substation
-
根据阳城电厂所处位置和电网结构的特殊性,发电机宜装设GCB,500kV升压站宜采用1/2接线方式。
According to location of the plant and special features of the power network structure the generator would better be equipped with GCB and 500 kV booster station be connected with 1 / 2 wiring mode .
-
论述了500kV变电站和发电厂升压站网控室监控系统的总体设计、设备的配置和布置、互联网络的集成、远前方式、与继电保护的接口、时钟同步以及控制和闭锁等问题。
The paper presents a general design of supervisory and control system in 500 kV substations and plants . The device configuration , integration of network interconnection . telecontrol modes , interface with protective relaying , timer synchronization , control and interlock etc.
-
升压站实时监测系统的设计。
Design of the real-time supervising system for booster station .
-
百色水利枢纽招标设计升压站方案比较
Electric power step-up substation scheme comparison for inviting design of Baise project
-
张家口发电厂升压站计算机监控系统方案设计与实施
Zhangjiakou Power Plant Booster Station Computer Supervisory System Project Design and Implementation
-
百色水利枢纽地下式升压站布置
Arrangement of Underground GIS Step-up Substation for the Power Station of Baise Project
-
发电厂升压站绝缘子串电压分布实测
Actual Measurement of Insulator String Voltage Distribution for Step-up Substation in Thermal Power Plant
-
百色水利枢纽升压站是电站工程的重要配套工程。
Electric power step-up substation is the important corollary engineering of Baise hydropower station .
-
因此对升压站的实时生产状况进行监测具有重要意义。
Therefore , the real-time supervising system of booster station is important for wind farm .
-
提出基于面向对象的风电场及升压站综合监控系统的总体设计方案。
An integrated monitoring system of wind power plant and substation based on object-oriented is proposed .
-
主要内容包括:1.升压站实时监测系统方案的研究。
The following are the main research contents : 1 . Research of the real-time supervising system for booster station .
-
福建柘荣龙溪三级水电站升压站边坡防护技术
Shielding Technique of Side Slopes of a Booster Station in the Youxi Three-step Hydropower Station of Zherong County , Fujian Province
-
目前发电厂升压站监控系统进行综合自动化改造是一种趋势,但是相对变电站综合自动化要复杂一些。
The integrated automation retrofitting in high voltage stations of power plants is more complicated than that in normal power system transmission stations .
-
大型电厂的升压站,在电力系统中的地位非常重要,直接影响系统的安全可靠运行。
The substation of large power plants is very important in the power system . It directly affects the safety and reliability of system operation .
-
文章对该升压站的五防闭锁功能进行了分析介绍,并与国内采用的现代微机五防功能进行了比较。
This paper analyzes and introduces the five-preclusion interlocks of the step-up substation , and compares with the functions of computer-based five-preclusion now used in our country .
-
如何早期发现在役支柱绝缘子及瓷套中存在的危及安全运行的裂纹,一直是升压站和变电站检修的难题。
How to discover the dangerous slight crack in early stage in labor pillar insulator and porcelain cover , is a problem of the overhaul in step-up station and substation .
-
基于对洞室围岩认识的深化以及围岩所具有的结构属性,介绍招标设计阶段将主变及升压站由初设阶段的地面布置方案优化为地下布置方案后的地下厂房洞室布置情况及其主要特点。
Based on deepening of cognition to the cavern wall_rock and its structure attribute , the main transformers and step_up substation are laid out in underground cavern in inviting design stage instead of that on the ground_surface .
-
升压(泵)站:在输水系统中用以增加主要出水管道压力的泵站。
Booster ( pumping ) station : A pumping station in a water distribution system that is used to increase the pressure in the mains on the discharge side of the pumps .
-
山西阳城电厂6台350MW发电机组采用发电机-变压器组接线方式,直接升压到500kV,发电机不设出口断路器(GCB),500kV升压站采用4/3接线方式。
The 6 × 350 MW electric generators in Shanxi Yangcheng Power Plant uses the generator-transformer bank mode of wiring and the 500 kV booster station adopts 4 / 3 wiring mode without GCB at the exit of the generator .