锅炉排污

ɡuō lú pái wū
  • Boiler Blowdown;boiler blow-off
锅炉排污锅炉排污
  1. 采用NaOH调节炉水降低锅炉排污率试验与实践

    Regulating and Reducing Dirt-discharge Rate Test and Practice using NaOH On Steam Drum Boiler Water

  2. 介绍了GE-I系列PC控制在电厂的锅炉排污系统的应用。

    Introduce the application of drain system of CE-I Series PC control in the boiler of power plant .

  3. 锅炉排污热损失的分析与控制

    Analysing and controlling on the heat-losing of the boiler 's sludge-draining

  4. 小型蒸汽锅炉排污热回收实例分析

    Example analyses of heat recovery from blowdown for small steam boilers

  5. 底部砰击预报锅炉排污噪声控制的简易措施

    THE PREDICTION OF BOTTOM SLAMMING Control of the Boiler blowdown Noise

  6. 油田热电厂1机组锅炉排污控制系统设计研究

    Thermal Power Plant Unit # 1 Oilfield Boiler Blowdown Control System Design

  7. 锅炉排污系统在使用时偶有事故发生,为消除隐患,保证锅炉运行安全。

    Frequent accidents are found in the usage of boiler drainage system .

  8. 从锅炉排污中回收热能,有效降低燃料成本

    Heat Recovery from Boiler Blowdown , Cut Cost of Fuel

  9. 如何控制锅炉排污热损失

    How to control the thermal loss of boiler blow down

  10. 锅炉排污余热利用实践

    Practice of Utilizing Afterheat of Drained Effluent of Boiler

  11. 锅炉排污的探讨

    Probe into the Pollution Discharge of the Boiler

  12. 锅炉排污对机组经济性的影响

    The Influence of Drainage to Generating Unit Economy

  13. 一种工业锅炉排污系统的节能改造方案

    A Plan for Energy Saving Oriented Modification in the Blow-down System of Industrial Boilers

  14. 锅筒型锅炉排污系统的合理设计

    Reasonable Design of Boiler Blow - down System

  15. 沈阳市燃煤锅炉排污系数统计

    Statistics of Coal Boiler Blowdown Coefficient In Shenyang

  16. 锅炉排污的控制与节能

    Control of boiler blowdown and energy conservation

  17. 1025t/h及以上锅炉排污系统存在的问题及建议

    Problems of Blowdown System on 1025 t / h and over Boiler and Relative Suggestions

  18. 锅炉排污噪声控制的简易措施

    Control of the Boiler blowdown Noise

  19. 介绍了锅炉排污余热利用节能工作的实践。

    The energy saving work practice of utilizing afterheat of drained effluent of boilers is presented .

  20. 锅炉排污量的控制

    Control of Boiler Wastewater Volume

  21. 采用新型固体吸附式制冷技术开发了电站锅炉排污热回收系统。

    A heat recovery system of discharged waste water from boilers in thermal power plant was developed .

  22. 锅炉排污系统设计

    Design of Boiler Drainage System

  23. 概述锅炉排污的意义、排污与节能的关系和定期排污的操作技术要点等。

    Significance of boiler blowdown , relationship of blowdown and energy-saving and key points of operation technology are described .

  24. 为消除锅炉排污系统存在的隐患,保证安全运行,提出了系统设计和操作方法的一些看法和建议。

    In view of problems in blowdown system of boiler , some idea about design and operation are put forward .

  25. 介绍了热泵式凝结水回收装置和锅炉排污闪蒸汽回收成套装置的特点和流程,可分别用于印染厂凝结水回用。

    The characteristics and procedure of condensate recovery device of heat pump type were introduced , and applied to condensate recovery from dyeing and printing plant .

  26. 锅炉排污量需要根据炉水水质条件和锅炉运行工况才能确定,否则就会造成较大的能量损失。

    Amount of the boiler 's sludge-draining is based on the water-quality in the boiler and the operation system of the boiler , or it will lose more energy .

  27. 以既有工程为基础,介绍了余热回收换热器的计算,分析了小型蒸汽锅炉排污热回收的可能性与经济价值,并在实际工程中得以验证。

    Based on an actual project , presents the calculation of heat exchanger for excess heat recovery , analyses practicability and economic benefits of blowdown heat recovery for small steam boiler , and verifies it in engineering .

  28. 铁岭电厂300MW机组锅炉连续排污系统优化改造

    Optimal Refurbishment of Continuous Blowdown System for 300 MW Boiler

  29. 新型锅炉连续排污扩容器的研究

    Study on A New Type of Continuous Blowdown Flash Tanks for Boilers

  30. 锅炉水排污存在问题原因分析及对策

    Analysis and countermeasure for the trouble during discharging boiler wastewater