超高压锅炉

  • 网络super high pressure boiler;super-high pressure boiler;superhigh pressure boiler;superpressure boiler
超高压锅炉超高压锅炉
  1. 从分析磷酸盐沉淀特性入手,介绍了炉内协调pH磷酸盐处理的控制参数,详细讨论了磷酸盐暂时消失特性及现行协调pH磷酸盐处理应用于超高压锅炉中存在的问题。

    Based on analysis to the property of phosphate precipitation , the controlling parameters of coordinated pH-phosphate treatment in boilers are presented . The temporary disappearance feature and troublesome problems existing in the said treatment applied to superhigh pressure boilers are discussed in detail .

  2. 超高压锅炉碱腐蚀爆管的探讨

    Discussion on Caustic-Corrosion Cracking of Superhigh - Pressure Boiler Tubes

  3. 超高压锅炉炉水低磷酸盐处理

    Testing and Research about Feedwater Treatment with Low Phosphate on Ultra-high Pressure Boiler

  4. 670吨/时超高压锅炉正确控制汽包水位的试验研究

    Maintaining a Desired Drum Water Level in a 670 t / h High-Pressure Boiler

  5. 400吨/时超高压锅炉制粉系统的改进及其效果

    Improvement of The Pulverizing Systems of 400 T / H Boilers and Its Economic Benefit

  6. 超高压锅炉试压水中Cl~-的测定

    Measurement of Cl ~ - in Water for Water Pressure Test of an Ultrahigh Pressure Boiler

  7. 总结了超高压锅炉炉水低磷酸盐处理试验结果。

    The testing results about treating feedwater with low phosphate on ult ra-high pressure boilers were summarized .

  8. 超高压锅炉汽包用低合金高强度特厚钢板在贵阳通过鉴定转产

    Ultra-thick plate of low alloy high strength steel for super-high pressure boiler 's superheater approved for commercial use

  9. 运行前,按标准应进行化学清洗,对特殊结构胀接的超高压锅炉是否也按标准执行,标准没有明确规定。

    It is not stipulated definitely whether the expanded tube joints with special structure in super high-pressure boiler shall be cleaned or not in accordance with the standard .

  10. 为全面掌握过热器壁温状况,在410t/h超高压锅炉上实时采集了炉内壁温及炉外壁温的变化情况。

    To fully keep track of the situation regarding the superheater tube wall temperature , a real-time acquisition of the tube wall temperatures inside and outside the furnace and their changes was carried out on a 410 th super-high pressure boiler .

  11. 电接点水位计、就地水位计是超高压锅炉最重要的测量仪表,其测量存在严重误差,致使锅筒实际运行水位长期高于设计值。

    Abstract The remote water level indicator and local water indicator are the prime instruments for high boiler , super high pressure boiler and subcritical pressure boiler . Its sampling severe error shows that the practical operation water level of the drum is realy much higher than the design value .

  12. 分析了胜利发电厂670t/h超高压煤粉锅炉管泄漏原因,提出了治理措施,从而有效地解决了管子泄漏问题。

    The cause of tube leakage occurring to a 670 t / h super-pressure coal-fired boiler is being analyzed , accompanied by some comprehensive countermeasures , which have effectively solved the leakage problem .

  13. 大型超高压循环流化床锅炉高温热烟气烘炉实践研究

    Practical application of dry-out with high temperature flue gas to a large capacity extra high pressure CFB boiler

  14. 220t超高压燃油D型锅炉的设计改进

    Design Improvement of 220t Super High Pressure Oil-fired D-type Boiler

  15. 南海发电一厂有限公司为了降低生产成本,提高上网竞争力,新建了670t/h超高压水煤浆锅炉。

    In order to reduce the manufacturing cost and improve the enterprise 's integrated ability to compete , Nanhai Power Plant 1 built a 670t / h ultra-high pressure coal-water slurry boiler .

  16. 超高压参数胀管锅炉酸洗问题的探讨

    Probe on Acid Cleaning of Super High Pressure Boiler with Expanded Tubes

  17. 国内首台220t/h超高压燃油D型锅炉的设计改进

    Improvement of 220 t / h D-Type Oil-Fired HP Boiler

  18. 新建670t/h超高压水煤浆锅炉的设计与调试

    Design and Commission of a New 670 t / h Superpressure Coal - Water Slurry Firing Boiler

  19. 440t/h超高压再热循环流化床锅炉冷渣器运行故障分析及处理

    Failures of the Slag Cooler of a 440 t / h Super-pressure Reheating Circulating Fluidized Bed Boiler & Analysis and Remedies

  20. 国产大型440th超高压再热循环流化床锅炉,采用引进国外410t/h或440t/h循环流化床锅炉设计技术,经消化吸收加以创新改进。

    Large , China made 440 t / h super-high pressure reheat circulating fluidized bed boilers were manufactured after assimilating with inventive improvement of some design technologies of pertaining 410 t / h or 440 t / h CFB boilers , licensed from abroad .