水利枢纽
- hydro-junction;key water control project
-
一水利枢纽地质工程问题剖析
An Analysis of Geologic Problems in key Water Control Project
-
本文介绍了乌江构皮滩水利枢纽的应用效果。
This paper introduces the applications of the method in Gupitan key water control project .
-
基于PLC现场控制单元技术的水利枢纽系统应用
The System Application of Hydro Project Based on PLC Site Control Cells Technique
-
百色水利枢纽RCC坝基岩体松弛及处理
Treatment on Loosen Rock Mass in Baise RCC Dam Foundation
-
长洲水利枢纽工程AGC功能设计及实现方法
Function Design and Implementation of AGC at Changzhou Hydraulic Complex
-
聚合物水泥防水涂料在百色水利枢纽RCC大坝上的应用
Application of polymer cement waterproof paint in RCC main dam of Baise Multipurpose Dam Project
-
针对某大型水利枢纽导流底孔弧形闸门,在闸门上布置若干MR阻尼器,采用优化模糊半主动控制来减小振动。
Optimized fuzzy semiactive control strategy was proposed to reduce the vibration of certain tainter gate installed with magnetorheological ( MR ) dampers in certain key large hydraulic project .
-
航空摄影测量与RTK技术在峡江水利枢纽工程测量中的应用
Application of GPS RTK and aerial photogrammetry technology in surveying Xiajiang Hydro-junction Project
-
以大柳树水利枢纽坝基灌浆试验效果检测为工程实例,重点介绍地震波CT技术的应用和效果。
Taking the dam foundation grouting test effect of the Daliuhe WRPP as an example , the author mainly introduced the application and effect of the earthquake wave CT technology .
-
GIN灌浆法在百色水利枢纽帷幕灌浆试验中的应用
Application of the JIN grouting method for curtain grouting test in the Baise project
-
本文基于TCP/IP体系结构,结合水利枢纽工程实际情况,提出一种把从现场采集的实时数据通过Internet传送给远程监测计算机的分布式远程监测系统的设计。
Based on TCP / IP structure and in combination with Water Project Reality , the designing of distribution remote monitoring system is put forward . It can convey real time data on the spot to remote monitoring computer by internet .
-
新型X宽尾墩-台阶溢流坝-戽式消力池作为消能工之一,在水利枢纽中得到广泛的应用,并且常常采用模型试验的方式来验证工程的安全性。
As one of the dissipation system , new X flaring gate pier-stepped spillway-bucket typed stilling pool is used in hydro-project , and always take the model experiment to validate the security of the project frequently .
-
通过对TG水利枢纽综合利用任务及泥砂淤积特性分析,本文针对水库运用中发电与排沙联合运用问题,建立了TG枢纽水沙联调的多目标数学模型。
Based on the multipurpose analysis and sediment feature in TG reservoir , a multiobjective programming model is presented here for the trade-off between power generation and sediment ejection in TG reservoir .
-
以W大型水利枢纽为例,讨论入股安置方式的可行性,并对其处理方案和实施效果进行分析与对比研究,效果比较理想。
Take W for example , a large-scale water conservancy project , this thesis discusses the feasibility of shares resettlement method , and then , comparatively analyses the processing scheme and implementation effect , effect is ideal .
-
江垭水利枢纽大坝为全断面碾压混凝土重力坝,坝高128m。
This is a whole profile roller compacted concrete gravity dam with height 128m .
-
在水利枢纽群及中小流域中,应用基于CIMS的体系结构和信息系统集成技术,集成防洪及水资源调度系统是一条有效的技术途径。
Applying system structure and information system integrated technique based on CIMS in hydro-junction group and small-mid scale basin , system of integrated flood control and water resources scheduling is a valid technical approach .
-
水利枢纽下游河道水位流量关系的变化任一断面的Z~Q关系受其上下游河段综合水力条件的影响,常在其水位变幅内水力条件多变,以一种线型(函数)拟合不能满足精度要求。
Cross-section stage-discharge relation ( Z ~ Q ) are usually influenced by the whole hydraulic conditions of upstream and downstream , and the hydraulic conditions in fluctuation range of the stage are so changeable that fitting of one curve form can not be necessarily precise .
-
黑河水利枢纽的拦河大坝为粘土心墙砂砾石坝,坝高130m。
The river retaining dam in Heihe Hydro Project , being 130 m in height , is a sandy gravel dam with the clay core wall .
-
面向有封闭内腔和外形的复杂工件快速原型制造的ICT图像处理及反求工程研究长洲水利枢纽电站1号发变组封闭母线伸缩节过热原因分析及处理
Study on RPM Based on Industrial Computed Tomographic Images of the Part with Complicated Interior and Exterior Shape ; Cause Analysis and Treatment of Overheated Enclosed Bus Expansion Joint of 1 # Generator-Transformer Unit at Power Station of Changzhou Hydraulic Complex
-
小浪底水利枢纽工程的2号明流塔,塔高108m,是主要泄洪建筑物2号明流洞的进口建筑物。
The No. 2 free flow tower is an intake building of No. 2 free flow tunnel , as one of the main flood discharge works .
-
近些年来随着我国水能资源的开发,我国设计和修建了一批坝高在300m级别的水利枢纽工程,其共同的典型特点是:高水头、大流量、窄河谷。
With the hydropower resources development in recent years , a batch of high dams is under design or construction in China , their common characteristics are : with high water head , with large discharge and narrow valley .
-
尼尔基水利枢纽骨料加工与混凝土拌和工程,是向尼尔基水利枢纽主体工程提供成品混凝土的工程,混凝土总量为105.13万m3,施工期为5a,每年仅可施工6个月。
The finished concrete which the principle part of the aggregate processing and concrete mixing words . The gross of the concrete is 105.13 × 104 m3 , concrete period is 5 years , and construction of concrete will be conducted for 6 months every year .
-
并且在进行决策评价时,本文主要采用了模糊层次分析法从定性和定量的角度分析了GX水利枢纽这一大型水利基础设施建设的必要性和最终效果。
In evaluation of decision-making , we use a fuzzy analytic hierarchy process to evaluate the GX project from the perspective of qualitative and quantitative analysis , and proof the necessity of using this method and show the final results of GX project .
-
长洲水利枢纽建坝后水流流态变化的可能性分析
The possibility analysis of flow pattern change after construction Changzhou hydroproject
-
陆水水利枢纽坝下游河床演变规律分析
An Analysis on Downstream River - bed Evolution of Lushui Project
-
应用模糊优选模型优选水利枢纽工程坝型
Dam type optimization for a hydro project by fuzzy optimum model
-
电气主接线的计算机辅助设计百色水利枢纽水电站电气主接线设计
Design of main electrical wiring diagram for Baise Multipurpose Dam Project
-
水利枢纽船闸系统的可靠度分析
Reliability analysis of lock gate systems in key water conservancy projects
-
塔底水利枢纽对河道行洪影响研究
Research on Influence of Tadi Hydraulic Project in River Flood Discharge
-
大坝渗流监测系统是水利枢纽安全运行的保证。
The seepage monitoring system can ensure the dam work properly .