崖门大桥
- 网络yamen bridge
-
崖门大桥收缩、徐变效应的计算与分析
Calculation and Analysis of Shrinkage and Creep Effect of Yamen Bridge
-
崖门大桥主梁施工测量
Construction Survey Control of Prestressed Concrete Box Girder in Yamen Bridge
-
应用大型TMD抑制崖门大桥RC桥塔的抖振响应
Applied TMD to suppressing buffeting response of RC pylon tower on Yamen cable - stayed bridge
-
最后,结合崖门大桥的桥塔施工进行实例TMD减振分析,实测结果表明TMD的减振效果非常好但其设计过程也很复杂。
It is demonstrated that the reduction of vibration by TMD to the tower of bridge is very effective despite the complicity involved in the design process .
-
崖门大桥主桥局部有限元分析
Finite Element Analysis for Locality of Main Spans of Yamen Bridge
-
崖门大桥施工监控的技术流程与主要成果
Technique Process and Chief Results of Construction Control for Yamen Bridge
-
广东崖门大桥主桥结构分析与设计
Analysis and Design of Main Structure of Guangdong Yamen Bridge
-
崖门大桥施工阶段风致振动时域分析
Time Domain Analysis of Wind-Induced Vibration of Yamen Bridge at Erection Stage
-
崖门大桥主梁牵索挂篮施工模拟计算
Simulation Calculation for Construction with Guyed Traveler for Main Girder of Yamen Bridge
-
崖门大桥施工过程中温度影响的分析、实测与补偿
Analysis , Measurement and Compensation for Temperature Effects During Construction of Yamen Bridge
-
崖门大桥主墩防撞套箱施工
Main girder protective shell construction of Yamen bridge
-
崖门大桥桥面沥青混凝土铺装施工工艺的研究与实施
Study and Application of Construction Techniques for Paving Asphalt Concrete on Yamen Bridge Deck
-
崖门大桥标准节段施工技术
Construction Techniques for Standard Segments of Yamen Bridge
-
崖门大桥总体设计与分析
Overall Design and Analysis of Yamen Bridge
-
考虑材料与荷载变异时崖门大桥施工阶段随机分析
Stochastic Analysis of Yamen Bridge at Erection Stage in Consideration of Variant Material and Loading Parameters
-
崖门大桥斜拉索施工
Stay Cables Construction of Yamen Bridge
-
研究的主要结论有:(1)经过平稳性和各态历经性检验,凤凰一桥和崖门大桥抖振响应过程具有广义平稳性和广义各态历经性。
Buffeting response processes of the Phoenix Bridge and the Yamen Bridge are stationary and ergodic by close verification .
-
本文依托广东崖门大桥桥面铺装为工程实践,对大跨径混凝土桥梁桥面铺装进行系统的研究。
Deck overlay of long span concrete bridge is studied systematically , based on engineering of deck overlay of Yamen Bridge in Guangdong province in this dissertation .
-
介绍了涪陵乌江二桥双塔单索面斜拉桥主梁的构造,通过与广东崖门大桥的对比,确定了涪陵乌江二桥主梁施工挂篮方案,并详细介绍了挂篮的设计。
Based on the comparison with the Yamen Bridge in Guangdong , the traveler construction scheme of the Wujiang Second Bridge was designed , and the design of the traveler was introduced in detail .
-
广东省西部沿海高速公路新会段崖门大桥工程技术要求高,施工难度大,工程项目施工管理复杂。
Yamen Bridge , on Xin Hui Section of coastal expressway in the west of Guangdong Province , is of high grade technical requirements in design , more difficulty in construction and more complication in project management .
-
崖门大桥为大跨径双塔单索面预应力混凝土斜拉桥,因单索面结构特性只能对称配重进行维修,需要全封闭交通,因此对桥面铺装的耐久性能要求更高。
Yamen bridge is a long span prestressed concrete cable-stayed bridge with double tower and single cable plane . There is a higher demand on durability of Yamen bridge deck overlay , in that traffic has to be closed down in rehabilitating for the structure character of single cable plane .