尾矿坝

  • 网络tailing dam
尾矿坝尾矿坝
  1. 地震作用下尾矿坝稳定及加筋效果分析

    Analysis of the Seismic Stability and Geotextile Reinforcement Effect of Tailing Dam

  2. 因此对于尾矿坝坝体的稳定性分析研究有着十分重要的现实意义。目前,尾矿坝坝体的稳定性分析计算是将其视为复杂边坡来处理,仍沿用土力学的传统理论进行分析。

    Therefore , the stability of the tailing dam has a very important practical significance . Currently , the tailing dam stability analysis is still to be regarded as a complex slope , and still use the traditional theory of the soil mechanics for analysis .

  3. GIS及模糊优选理论在尾矿坝选址中的应用

    Application of GIS and fuzzy optimization theory to location of tailings dam

  4. 卡尔曼滤波在尾矿坝变形GPS监测中的应用

    Application of Kalman Filter in Deformation Monitoring for Tailing Dam by GPS

  5. 尾矿坝渗流场的ANSYS有限元分析

    Finite Element Analysis for Seepage Field in Tailing Dam by ANSYS

  6. 尾矿坝监测数据分析的RBF神经网络方法

    RBF Neural Network Method for Analyzing Monitoring Data of Tailings Dam

  7. 银山铅锌矿尾矿坝浸润线最大Lyapunov指数分析

    Analysis of the Largest Lyapunov Exponent of the Seepage Line of Tailings Dam of Yinshan Lead-zinc Mine

  8. 基于最大Lyapunov指数分析的尾矿坝浸润线控制混沌方法

    A new method for chaos-controlling of seepage line in tailings dam based on analysis of largest Lyapunov exponent

  9. 根据这一定义,对银山铅锌矿尾矿坝浸润线进行了模型与Lyapunov指数的耦合分析。

    According to this definition , an analysis is made for cupling between the model and Lyapunov exponents of the seepage line of Yinshan Lead-zinc mine 's tailings dam .

  10. 建立了尾矿坝监测数据分析的RBF神经网络模型,并利用实际数据对此网络进行了训练和检验。

    A RBF ( radial basis function ) neural network model for analyzing the monitoring data of tailings dam was established , and then trained and tested using practically collected data .

  11. 同时,以毕肖普简化法原理为基础,运用Fortran语言编写程序来分析尾矿坝的整体稳定性。

    And , this paper provides a program based on simplified Bishop method . This program edited by fortran language is used to analyse the stability of tails dam .

  12. 应用这种方法,分析了银山铅锌矿尾矿坝浸润线实测数据。结果表明,叠加周期振动可以降低最大Lyapunov指数。

    The method helps to monitor the seepage line data of tailings dam in Yinshan lead-Zinc Mine , Jiangxi , indicating that the largest Lyapunov exponent can be reduced by stacking with a periodic vibration .

  13. 通过使用ANSYS软件对尾矿坝进行了非线性静力、非线性动力分析计算,坝体的应力、位移分别符合一般规律,在动力作用下坝体的动力反应较弱,对大坝的安全影响不大。

    By using ANSYS , the nonlinear static and nonlinear dynamic analysis of the tailing dam are finished . The distributions of the stress and strain have been worked out ; and the stress and displacement accord with the general rule .

  14. 利用2D-FLOW软件进行了尾矿坝渗流场的数值计算分析。

    Numerical analysis of the tailings dam seepage field using 2D-FLOW software .

  15. 尾矿坝堆高至标高730m、750m以及780m时,在两种工况下的稳定系数均满足要求。

    Tailings dam to the elevation of high-piled 730m , 750m and 780m at the stability factor of two conditions are satisfied .

  16. 本文基于现场SPT和CPT的测试数据,分析了这两种测试方法之间的相关关系,为测试数据在尾矿坝方面的解释及应用提供了依据。

    Based on data from in-situ investigation on a tailings dam in China , the author in the paper analyzes the relationship between SPT and CPT , and provides a reliable basis on their interpretation and application in the tailings dam engineering .

  17. 尾矿坝排渗方法对比分析与研究

    Analysis and research of methods treating water seepage from tailings dam

  18. 变分法在尾矿坝稳定性分析中的应用研究

    Study on application of variation calculus instability analysis of tailing dam

  19. 尾矿坝地震液化稳定的简化分析

    Simplified analysis of liquefaction and stability of tailing dam during earthquake

  20. 尾矿坝变形监测数据自动导入系统的研究

    Automation importing system for deformation monitoring data of a tailings dam

  21. 支持向量回归机在尾矿坝浸润线预测中的应用

    Forecasting of infiltration route in tailing dam by Support Vector Regression

  22. 金属矿山尾矿坝的溃坝事故及其他有关情况简介

    Accidents of tailings dams in metal mines & a brief report

  23. 水对尾矿坝稳定性影响研究

    The Research of Water Influence on the Trail Dam 's Stability

  24. 对江西铜业公司尾矿坝安全监测的思考

    Consideration about safety supervision for tailing dam in Jiangxi Copper Company

  25. 岩土工程多参数观测系统在尾矿坝浸润线观测中的应用

    Application on System of Multi-Parameter Synthetical-Test in Saturation-line at Tailings Dam

  26. 尾矿坝非线性系统混沌与安全研究

    Research on Chaos and Safety of Nonlinear System for Tailings Dam

  27. 模型试验与数值模拟对尾矿坝稳定性综合预测

    Model test and numerical simulation of tailing dam safety forecasting

  28. 高尾矿坝&地基相互作用的地震反应分析研究

    Study on seismic response analysis for high tailing dam & foundation interaction

  29. 尾矿坝埋管土压力研究

    Research on Soil Pressure of Buried pipes in Tailing Dam

  30. 防洪渡汛是尾矿坝安全管理的重点。本文根据安全工程学原理,建立了汛期尾矿库溃坝事故树,并进行了最小割集、最小径集及结构重要度分析。

    Flood prevention is emphasized in the safety management of tailings dam .