坝陵河大桥
-
坝陵河大桥施工技术阶段总结
The Stage Summary of Baling River Bridge Construction Technology
-
坝陵河大桥钢桁加劲梁施工架设方案研究
Research on Erection Methods of Steel Stiffening Truss Girder for Baling River Bridge
-
坝陵河大桥边坡稳定性工程地质评价
The engineering geology evaluation of Baling river big Bridge side and slope stability
-
高山峡谷地区坝陵河大桥西岸高边坡工程效应研究
Study on Engineering Effect of Baling River Bridge High Slope in Alpine Gorge Area
-
坝陵河大桥钢桁加劲梁主桁架整体节点疲劳试验
Fatigue test on integral joint of the main truss of the Baling River Bridge
-
坝陵河大桥东索塔承台大体积混凝土施工控制
Bulk concrete construction control in base slab of East cable support tower of Baling River Bridge
-
坝陵河大桥是目前国内最大的钢桁加劲梁悬索桥,重点介绍主体结构的关键施工技术,以供参考。
The Baling River Bridge is the greatest hanging-bridge with the steel span truss beam in china currently , the construction technology about the main body structure will be introduced , providing a reference .
-
根据沪瑞国道主干道线坝陵河悬索大桥西锚洞勘察试验资料,本文论述了碳酸盐岩软弱夹层的物理力学性质。
According to the date of exploration and test in west anchoring tunnel at Balinghe River suspension bridge , the properties of weak intercalation in carbonate rocks are discussed in this paper .