东兴站

  • 网络Dongxing Railway Station
东兴站东兴站
  1. 施工过程中取得的实测数据证明:本文所研究的各项施工技术可行,效果明显,能够防止过量变形,保证了东兴路站的基坑安全。

    The data collected from the construction procedure has proved that : each constructing technology of this paper studied is possible and successful . It can prevent deep excavation from excessively deformation and make sure of the security of constructing Dongxing Lu Station .