顶推船队

  • 网络push train;pusher train
顶推船队顶推船队
  1. 为了合理计算内河分节顶推船队运输方式的经济效果,本文阐述了综合经济指标E的概念。

    In order to calculate reasonably the economies of transport method of the river push-train , the paper describes the concept of the comprehensive economic index " E " .

  2. 成本结构对长江分节顶推船队经济性的影响

    Influence of Cost Structure on Economy of Changjiang River Push - train

  3. 分节顶推船队波浪系结力的预报方法

    A Method for Predicting Connection Forces of Push-Train in Waves

  4. 利用自航船模试验预报分节顶推船队操纵性的研究

    Study on Prediction of Maneuverability of Integrated Barge Push-Train by Self-Propelled Model Test

  5. 顶推船队安全过弯的引航模型研究

    Study on the navigation model for the pushing fleet to transit the bending channel

  6. 内河分节顶推船队的综合经济指标

    The Comprehensive Economic Index of the River Push-train

  7. 销式联接装置结构参数与受力分析&海上顶推船队

    Analysis of parameters and leading of structure pin - connecting Device & Pusher Boat fleet at sea

  8. 湖南省内河及干支直达分节顶推船队技术经济分析

    Technical and Economical Analysis on the Operation of the pushed Barge Train in the through Shipping in Hunan Province

  9. 作为类似顶推船队联结装置设计的依据,论文提出的联结力的估算公式具有一定的实用价值。

    As the basis of the design of the connecting device , the formula the paper gives out has its actual value .

  10. 海段宜采用20000吨级的自卸船;长江段宜采用8×2000吨级的分节顶推船队。

    And it is suitable for 20000 t self-discharging ships to sail on the sea and 8 × 2000 t sectional pushing vessel flotillas on Changjiang River .

  11. 本文叙述了顶推船队1∶100模型尺度效应的影响程度、补偿方法以及在相应比尺的葛洲坝水工模型中进行通航试验的情况。

    This paper states influence of the scale effect of the push-train model ( Scale 1 ∶ 100 ), the compensation method and the navigation test on the waterway of the Ge-Zhou Dam model .