煤柱
- 名pillar
-
[coal column] 地下采煤时,为了工作方便和安全而保留的、暂时或永久不予开采的一部分矿体
-
防水煤柱安全评价的流固耦合分析
Fluid-Solid Coupling Analysis of the Safety of the Waterproof Coal Pillar
-
因此煤柱的回收是目前急需解决的问题。
So pillar extraction is a problem to be solved presently .
-
本文首先采用有效区域理论计算了煤柱载荷P煤;
In the paper , the load of coal pillars is firstly calculated by effective area theory ;
-
UDEC模拟厚松散层及超薄覆岩条件下开采防水煤柱覆岩突水可能性
UDEC simulation of the water-pouring probability in exploiting waterproof coal pillars under the conditions of thick loose bed and ultrathin overlying strata
-
研究认为影响250102工作面发生冲击矿压的主要因素为褶曲构造、煤层冲击倾向性、坚硬顶板、20m煤柱等。
The main factors of influencing the rock burst hazard of 25102 working face are folding structure , burst tendency of coal seam , hard main roof and 20m width pillar and so on .
-
当煤柱宽度超过23m时,煤柱强度基本不增大的结论,对以后煤柱设计具有一定的参考价值。
The coal pillar intensity basically maintains constant as the coal pillar width surpasses 23 m , which provides a certain reference value to the coal pillar design .
-
采用岩石破裂过程分析软件RFPA2D系统,对短壁机械化开采的煤柱稳定性进行数值计算与分析。
The stability of coal pillar of the short-wall mining was analyzed systemically by numerical simulation with the rock failure process analysis software ( RFPA2D ) .
-
根据正交实验结果,提出了改善深井巷道围岩体稳定性的措施。经观测发现,煤柱分为3个区:塑性变形区,煤壁内0~4m;
According to the observation , it is found that the pillar can be classified as 3 zones in stress conditions as follows : ( 1 ) the plastic zone , 0-4 m from the edge of the pillar ;
-
通过分析解析解与数值模拟结果可知,在一定距离内煤柱越宽巷道受力越大,在此种地质条件下,开采巷道的煤柱留设尺寸为3m时比较符合工程实际。
According to the analytic solution and numerical simulation result , the paper drew the conclusion that the wider of the pillar the larger of the laneway stress , and under this geological condition the 3m of pillars measure of exploitation laneways is more agree with the project practice .
-
走向条带煤柱破坏失稳的尖点突变模型
Cusp catastrophic model of instability of strip coal pillar along strike
-
采空区煤柱-顶板系统失稳的力学分析
The analysis of instability of coal pillar & stiff roof system
-
无煤柱护巷支护技术提高资源回收率
Improving Coal Recovery by Supports Technique of Protecting Road without Pillars
-
煤柱稳定性的时间相关性分析
Analysis of the time - dependence of the coal pillar stability
-
煤柱应力分布规律的数值模拟分析
Analysis on digital simulation for stress distribution law of coal pillar
-
大同矿区的煤柱现状及开采对策
Status-quo and Mining countermeasures of Coal Pillar in Datong Mining Area
-
矿间防水煤柱合理尺寸的理论分析
Theoretic Analysis of the Rational Size of Water Barrier between Mines
-
弧岛煤柱水力开采的矿压控制
Rock Pressure Control in Hydraulic Mining of the Isolated Shaft Pillar
-
用影响椭圆法确定建筑物保护煤柱
Design of coal pillar of building protection by influencing ellipse method
-
条带开采留设煤柱置换开采方法的数值模拟研究
Numerical Study on Substitution Extraction in Coal Pillar of Strip Mining
-
回收大巷保护煤柱时通风系统的优化
Optimization of Ventilation System in Protection of Pillar on Recovery Roadway
-
运输平巷上方的煤柱柱子竖立在狭窄的地基上。
Pillar of ground The column stands on a narrow base .
-
断层防水煤柱设计的可靠度方法
The Method of Stability for the Design of Fault Waterproof Pillar
-
伪倾斜柔性掩护支架开采石门煤柱
Pillar Mining of Rock Cross-cut with Pseudo - sloping Flexible Shield
-
论井下隔水煤柱承压破坏的临界尺寸
Research on critical size of water barrier in underground coal mine
-
阳泉综放面合理区段煤柱的有限元数值分析
FEM analysis of pillar in the rational section of full-mechanized face
-
窄煤柱护巷机理的数值模拟分析
Numerical simulation on the principle of supporting roadway with narrow coal pillar
-
深井沿空巷道合理小煤柱尺寸的确定
Confirmation of Reasonable Pillar Dimension of Roadway along Gob in Deep Mine
-
运用实测技术确定区段煤柱宽度
Ascertaining the Width of Stage Coal Pillar by Applying the Observation Technology
-
条带开采煤柱留设对地表建筑物的影响分析
Analysis of Effect of Coal Pillars for Strip Extraction on Surface Buildings
-
孤岛煤柱综采工作面旋转开采关键技术
Key Technique on Revolving Mining in Gob-Surrounded Pillar with Fully Mechanized Mining