Study on sediment siltation for extension project of Weifang harbor
根据现场实测资料,分析潍坊北港港池冲淤和河道变化的原因,提出合理的汉道选择。
In this paper , based on the survey datas , the sources of harbour scour and deposition and channel deformation are analysed , rational branch channel is obtained .