沸水堆核电站
-
沸水堆核电站放射性废物管理与辐射防护的进展
Advances in radioactive wastes management and radiation protection at nuclear power plants with boiling water reactors
-
2沸水堆核电站模型的验证:通过程序稳态调试,与实际运行数据比较,对所建模型进行调试和修改,确保了模型正确性与可靠性。
BWR nuclear power plant model validation : compare the steady state calculation result with the actual operating data to ensure model accuracy and reliability .
-
因此,建立一个准确完整的沸水堆核电站机理模型,对研究沸水堆特性以及两相流不稳定性问题有着重要的意义。
Therefore , to establish an accurate and complete BWR model is of great significance to the study of dynamic characteristics and two-phase flow instability problems of BWR .
-
3控制系统建模:在模型基础上建立了沸水堆反应堆核电站的控制系统模型,对于电厂发生的变工况及故障工况能够进行实时的模拟,验证了控制系统的调控功能和抗干扰性。
BWR control system modeling : based on the model , establish the BWR reactor power plant control system , and complete the real-time simulation of variable conditions and fault conditions , which verify the regulatory functions and disturb resistance capacity of control system . 4 .