水泥船

shuǐ ní chuán
  • Cement ship;cement weigher
水泥船水泥船
  1. 最近他们学会了浇铸轻型水泥船。

    Recently they have learned to cast light concrete boats .

  2. 内河400t散装水泥船设计要点

    The key technical points in the design of 400 t inland river bulk cement carrier

  3. 针对内河5000t级散装水泥船设计要求,采取肥大船型、浅吃水、大方型系数、双尾、小球鼻首等技术;

    According to the design requirements , techniques of full form , shallow draught , large block coefficient , catamaran-stern , small bulbous bow and so on are employed to design the inland 5 000 t bulk cement self-discharging ship .

  4. 散装水泥船船型发展趋势

    Development trend of ship form of bulk cement carrier

  5. GB/T7312-1987钢丝网水泥船检验方法

    Inspection methods for hull of ferrocement ship

  6. 3000吨散装水泥船装卸过程的自动控制模拟样机简介

    Simulation prototype of automatic control system for cargo handling of 3000 ton bulk cement carrier

  7. 本文介绍了气力输送的原理和设计,并推荐了内河气力输送罐装水泥船的船型。

    The principle of design and the method of calculation for the pneumatic transfer of bulk cement on board of ship is introduced and the form for an inland 60t cement bulk carrier is recommended .

  8. 通过分析当前散装水泥船、码头装卸设施及未来发展趋势,介绍了一种新型散装水泥船的特点和船型关键技术。

    Based on the analysis of current bulk cement carrier s , terminals and their future development trend , this paper introduces the features and key techniques of ship form of a new-type bulk cement carrier .

  9. 1500t散装水泥运输船管道设计

    Design of the Pipeline of 1 500 t Bulk Cement Carrier

  10. 介绍了1500t散装水泥运输船的水泥管道输送原理,给出了该船上压缩空气管、流化空气管和水泥装卸管的管径、风压、流量等参数的计算和选用方法。

    The paper introduced the theory of piping transportation of the 1 500 deadweight ton bulk cement barge , and provided the numeration and selection method of main parameters , such as pipe diameter , wind pressure , flux , etc.

  11. 自卸式远洋散装水泥运输船特殊结构强度分析研究

    On Special Ship Structure of Self-unloading Bulk Cement Carrier

  12. 为了加速我国水泥散装水运进程,为了促进我国水泥进入国际市场,研制我国自己的大型远洋散装水泥运输船已成为当务之急。

    In order to speed up the transportation of bulk-cement by water in our country , and the opening of its international market , it has become the task of top priority to develop large-sized ocean-going cement carriers of our own .