evm
- 网络挣值管理;误差向量幅度;评估模块;误差矢量幅度;评估板
-
Study on the Investment Management Information System of Thermal Power Project Based on EVM
基于EVM的火电工程投资管理信息系统的研究
-
The Applied Research of EVM during the Construction Stage
EVM在工程建设实施阶段的应用研究
-
Assessment of energy company 's credit capacity based on AHP and EVM
基于组合权的企业信贷能力综合评价
-
Design of general EVM test model based on SDR and analysis of its uncertainty
基于软件无线电架构的EVM通用测试模型与不确定度分析
-
Characteristic Analysis and Experimental Verification of EVM for Digital Predistortion Power Amplifier
数字预失真功放EVM特性分析与实验验证
-
The research on EVM measurement algorithm for 3G UE conformance test
3G终端EVM指标一致性测试算法的研究
-
EVM measurement algorithm for TD-SCDMA UE conformance test based on iterative process
基于迭代的时分同步码分多址系统终端误差矢量值一致性测试算法
-
BOC-TISCO Air Separate Unit Project Schedule & Cost Control under EVM Principle
实获值原理在太钢-BOC空分项目进度和费用控制中的应用
-
Connect the power cable to the EVM power jack on the board .
连接电源线的EVM板上的电源插座。
-
These activities consume project resources and should be included in EVM planning and measurement .
但这些活动也消耗了项目资源,所以理应当包括在赢得值管理中加以计划和测定。
-
EVM caused by non ideal transmission channel-theory , simulation and measurement
非理想传输通道对数字调制信号EVM的影响&理论、仿真和测量
-
Structure and property of EVM vulcanizates reinforced by magnesium methacrylate
甲基丙烯酸镁增强EVM硫化胶的结构与性能
-
EVM , together with agile method , act as a effective solution in the development and implementation of database project .
依据挣值统计结果,提出挣值剖析结合灵敏方式是数据库项目开发和实行的有效的管理解决计划。
-
Simulation and Analysis of the Digital Transmitter EVM Vector differences may also be found by the method of rectangular resolution .
数字发射机的误差矢量幅度仿真与分析矢量差也可用正交分解求得。
-
However , many implementations of EVM follow waterfall models of requirements , design , development , test , release .
然而,很多挣值管理的实现都遵循瀑布模型:需求分析、设计、开发、测试和发布。
-
Study on Formulation and Aging Properties of Rubber-like EVM
橡胶型乙烯-醋酸乙烯共聚物配方及老化性能研究
-
Effect of magnesium methacrylate on properties of EVM vulcanizate
甲基丙烯酸镁对EVM硫化胶性能的影响
-
A linear anisotropic k-e EVM which allows prescription of boundary conditions of structure direction of turbulence
能加入湍流结构的方向性特征的边界条件的K-ε涡粘性模型
-
Study of EVM / organic montmorillonite nanocomposite
蒙脱土增强EVM橡胶纳米复合材料的研究
-
Introduced the polymerization craft , performance and application of ethylene-vinyl acetate ( EVM ) copolymer .
介绍了乙烯&乙酸乙烯酯(EVM)共聚合物的聚合工艺、性能及应用。
-
EVM vulcanizate reinforced by in situ prepared sodium acrylate
原位合成丙烯酸钠制备EVM吸水膨胀橡胶
-
The Effect of Dynamic Vulcanization on the Processing Rheologic Behaviour of TPU / EVM Blends
动态硫化对TPU/EVM共混物加工流变行为的影响
-
Evaluation module ( EVM ) without the embedded operation system must be configured with high efficiency and facility integrated development environment ( IDE ) .
在移植嵌入式操作系统或进行嵌入式应用系统的开发之前,必须为嵌入式系统裸机配置高效方便的集成开发环境。
-
The dynamic forecasting model relies on the EVM effective model and make improvements on this basis , using Multi-level fuzzy comprehensive evaluation and quantitative methods .
依托挣值管理有效模型并在此基础之上进行改良,采用多层次模糊综合评判与数量化方法探析动态的挣值预测模型。
-
This paper analyzes the shortcomings of applying expected monetary value ( EVM ) as a tool for assessing risks and response options .
本文分析了把期望价值(EMV)作为评估并回应风险的工具的缺点。
-
Two parameters of the linear performance , ACLR and EVM are slightly worse , but can meet the specifications .
表示线性性能的两项指标,ACLR和EVM都略有恶化,但可以满足规范。
-
Note : Some of the steps in this section have been updated from those used in the EVM Quick Start Guide .
注:在本节中的步骤的一些已经在EVM快速入门指南中所使用的更新。
-
EVM , as a new project integrated management technique , is able to manage integratively and control product development progress , cost , quality and technique .
而挣值管理作为一种新兴的项目集成化管理技术,能够实现产品研发进度、成本、质量和技术的综合管理与控制。
-
We have known about some foreign advanced construction project management during my postgraduate studying , which Earned Value Management ( EVM ) is one of them .
在研究生阶段的学习当中我们接触到一些国外先进的工程项目管理方法,其中赢得值管理方法就是其中之一。
-
But there is also some limitation in traditional EVM , because it overlooks the internal connection and impact between quality level and cost and procedure .
但是传统意义上的挣值分析方法也存在一定的缺陷,它忽略了质量水平与成本以及质量水平与进度之间的内在联系和相互影响,不能反映质量对成本、进度的影响情况。