KGS
- 网络千克;重量;毛重/净重;索姆;吉尔吉斯斯坦索姆;比思
-
The Random Attractor of KGS System in Lattice with White Noise
具有白噪音的KGS格点系统的随机吸引子
-
This dissertation proposed two knowledge-based genetic scheduling algorithms , KGS and CPGS .
本文提出了基于知识的KGS和CPGS两种遗传调度算法。
-
In this paper , we study KGS equations with weakly damp using Chebyshev rational spectral .
本文运用Chebyshev有理谱方法讨论具有弱阻尼的KGS方程的大时间性态。
-
We pack sugar In new gunny bag of 100 kgs . each .
我们用新麻袋装糖,每袋100千克。
-
The Current Situation and Countermeasures of the Chinese Men 's Calisthenics in 70 kgs in the 14 Session of the Asian Games
从14届亚运会看我国男子健美70公斤级竞技能力及对策
-
PACKING In steel drums filled with argon of50 kgs net each with inner sealed double plastic bags .
包装内塑料袋密封,外铁桶充氩气,每桶净重50公斤。
-
Bay Bow Anchor , 1290 kGs , stockless type .
求购锚链,1290公斤,无锚杆的类型。
-
The beast is estimated to weigh between 250 and 400 kgs .
人们估计它的重量在250到400公斤之间。
-
Sack dress ( short loose straight dress ) We pack sugar in a new gunny-bags of 100 kgs . Each .
布袋装(宽松直筒短装).糖是装在粗麻布口袋的,每袋100公斤。
-
Packing : in hew gunny-bags , 100 kgs . to each bag
包装:新麻袋包装,每袋50公斤
-
And I 'm not talking about minor weight fluctuations here , I 'm talking about a range of 10-50 kgs ( 22-110lbs ) or more .
而且,我这里指的还不是一两斤上下的小变化,我指的是10-50公斤(22-110磅)甚至更多的体重变化。
-
Investigation and analysis on the current situation of the sports meetings in rural middle schools The Current Situation and Countermeasures of the Chinese Men 's Calisthenics in 70 kgs in the 14 Session of the Asian Games
对农村中学学校体育运动会的调查与分析从14届亚运会看我国男子健美70公斤级竞技能力及对策
-
Packing : in plastic bottle stuffed with purified water , less than 2 kgs net weight for each bottle , then put in iron drum , less than 20 kgs net weight for each drum .
包装:用塑料瓶充纯水保护,每瓶净重不超过2公斤,并置于铁桶中,每桶净重不超过20公斤。
-
The 8000 kgs / h system of the tobacco business enterprise silk thread is that business enterprise " 15 " point skills change engineering item . Is an item core the management control of the part system , carry the control mission of the whole system silk production car .
某烟草企业8000kg/h制丝线是该企业十五重点技改工程项目,作为其项目核心部分的自动化管控系统,担负着整个制丝生产车间的生产控制任务。
-
In view of the change in ore properties with the mining towards depth , a program for optimizing the flowsheet was set forward and the results of the optimization by applying GD pulsating magnetic separators and KGS high frequency vibrating fine screens were analysed .
针对矿山向深部开采后矿石性质的变化,提出了优化流程的方案,并分析了采用GD型脉动磁选机和KGS型高频振动细筛对流程进行优化的效果。