江桥
- 网络Jiangqiao;bridge
-
第二松花江桥跨度30m简支T梁横向加固试验研究
Study on Experiment for Reinforcement of 30 m-span Simple-support T-sectional Girder in the 2nd Songhuajiang Bridge
-
上回讲到高佬和霉两人赶走江桥后,有人从不知何处闪了出来。
Speak two people , high guy and mildewed to kick out last time after river 's bridge , someone never knows to strain out where .
-
目前住江桥(上海郊区)公司安排的宿舍。
Now he lives in company provided accommodation on the outskirts of Shanghai .
-
在自我介绍完之后,高佬和江桥就开始打起来了。
After introducing myself to finish , high guy and river 's bridge start beat .
-
大瑶山隧道设计与施工汉江桥176米斜腿刚构的设计和施工
Design and Construction of the 176m Slant-legged Steel Rigid Frame Bridge across the Hanjiang River
-
江桥心里一惊:好厉害的女人,竟看穿我的门路!
River the bridge in the mind a surprised : very fierce woman , see through my way of approach unexpectedly !
-
后江桥铅锌矿具有多源、多阶段成矿特点,成矿主要与泥盆纪地层及热液作用有关。
The Houjiangqiao Pb Zn deposit features multi source , multi stage in mineralization , which is mainly related to Devonian strata and hydrothermal activity .
-
大跨度桥梁尤其是斜拉桥和悬索桥,越来越成为跨江桥乃至跨海桥的首选桥型。
Long-span bridges , especially cable-stayed bridges and cantilever bridges , are more and more preferred as the first choice of river-crossing bridges , or even sea-crossing bridges .
-
为改建铁路绥佳线佳木斯松花江桥,设计时进行了桥位、桥式综合技术经济的比选。
In the design of reconstructed Songhuajiang River Extra Large Bridge , a comprehensive comparison was made with respect to bridge location and bridge type , and hydraulic model test was conducted .
-
通过芜湖市中江桥加固工程实例,介绍采用体外预应力方法加固危桥的具体设计施工及其效果评价。
Introduced here are details of the design , construction and appraisal of unsafe bridge enhancement by means of external prestressing , with the example of Zhongjiang Bridge in the city of Wuhu .
-
5,根据墨江桥的实际情况建立稳定型悬索桥模型,在四种工况载荷作用下,利用自行编制的程序计算桥的位移、构件的内力、应力等。
According to the actual situation of MoJiang Bridge , the model of the SSB is established . The displacement , internal forces , stresses and others of this bridge under four load cases are calculated by use of the established program .
-
就在他发呆的时刻,高佬在空中向下使出了一刀两断斩劈向江桥。于是我们立刻出发,有时不得不在齐胸深的灌木中穿行。
At time that he daze , the high guy gets down to use to make a clean break to cut to split toward river 's bridge in the sky . And we set off at a great pace , sometimes plunging through the bushes to the chest .
-
澜沧江悬索桥预应力锚碇应力测试与分析
Test and Analysis of Pre-stress and Anchorage Stress on Lanchang River Cable-stayed Bridge
-
京九铁路浰江大桥桥上无缝线路设计方案研究
Study on Continuously Welded Rail Design on Deck of Lijiang Bridge of Jing-Jiu Railway
-
依兰松花江大桥桥址方案的选择
Site Selection of Yilan Songhua River Bridge
-
嘉绍高速公路跨钱塘江大桥桥址比选和通航孔设置研究
Option seeking for bridge site of Jia-Shao Expressway crossing Qiantang River and study on navigation opening location
-
为了研究倒张拉系统的作用建立了墨江桥成桥状态下的两种力学模型。
Two kinds of mechanics model of mojiang bridge in completed status has be built to research the effect of inverse stretched system . 3 .
-
随着大跨距跨江铁路桥的建设,车和桥的耦合振动会引起接触网的振动,进而影响弓网的耦合振动。
Along with the construction of large-span , river-crossing bridges , vehicle-bridge coupling vibration will make catenary vibrate , which can further affect pantograph-catenary coupling vibration .
-
对拟建的松花江大桥桥区段进行河床演变分析,论证了在此建桥对航道的影响程度以及该桥位是否可以满足建桥通航要求。
The paper analyzes the Songhua River bridge riverbed evolvement , and argues that the effecting level of this building bridge to the sea-route and discusses whether this bridge meets the demand of sea-route .
-
贵溪信江铁路特大桥全长798.3m,水面宽约400m,水深7~11m,基岩裸露,且冲沟满布。
The total length of Guixi Xinjiang extra long railway bridge is 798.34 m. The width of water river is about 400 m , and the depth of water is 7.0 to 11.0 m. The bared bed rock is distributed with gullyings .
-
松花江斜拉桥主塔混凝土施工
Concrete Construction Of Main Tower Of Songhuajiang Cable - Stayed Bridge
-
松花江斜拉桥夜景景观设计
Design of Night Landscape for Cable-Stayed Bridge over Songhua River
-
松花江公路特大桥南岸主塔钻孔桩成孔工艺
Boring construction technology of main pier piles in Songhuajiang Road Bridge in Harbin City
-
哈尔滨松花江斜拉桥主墩钻孔桩施工
Construction of drilled shafts in main pier of Songhuajiang cable stayed bridge in Harbin
-
松花江公路特大桥主塔钻孔桩水下砼施工
The underwater concrete construction for Songhuajiang River highway extra-long span bridge main pier cast-in-place concrete pile
-
松花江斜拉桥主塔承台井点降水的设计与施工
Design and construction of wellpoint precipitation on main tower base slab of Songhua River cable-stayed bridge
-
同时还对南充嘉陵江双线特大桥在保证稳定性能方面的合理性进行了分析。
Meanwhile , the rationality was analyzed on ensuring the stability of Nanchong Jialing River double-track extra long railway bridge in the end .
-
岩溶处理中钻孔施工技术初探松花江公路特大桥南岸主塔钻孔桩成孔工艺
A Preliminary Probe into the Boring Construction Technology in Karst Disposal Boring construction technology of main pier piles in Songhuajiang Road Bridge in Harbin City
-
温哥华的江森大街桥将立即停用因为高昂的防腐维护费用,这些费用大大超出了预算。
The Johnson Street Bridge in Vancouver was suspended from use indefinitely due to costs of corrosion repair , which exceeded the bridge 's repair and maintenance budget .
-
介绍哈尔滨绕城公路松花江斜拉桥主塔锚固区环向预应力、锚固钢横梁及预应力、竖向预应力的布置情况及有关的预应力施工工艺。
The distribution of ring pre-stress , anchoring steel beam and pre-stress , vertical pre-stress of the anchoring zone of the main tower in Songhuajiang cable stayed bridge are introduced and the corresponding construction technologies are clarified in the paper .