南京站
- 网络Nanjing Railway Station
-
南京站主站房下部为混凝土结构,屋盖为斜拉钢结构。
In Nanjing Railway Station , concrete is used as the main structure and stay cable steel structure as the roof construction .
-
较详细地介绍了南京站主站房斜拉索锚固节点的试验过程,包括有限元计算、试验装置设计、试验结果分析等。
This paper introduces the experimental study on the model test of anchoring joint of stay cable used in Nanjing railway station , including the finite element analysis , the design of the test installation , the test results analysis , etc.
-
南京站规划设计景观解读
Landscaping denotation of the planning and design of Nanjing railway station
-
南京站主站房地震模拟振动台试验研究
Shaking table test for the structure of Nanjing Railway Station
-
城市地铁(南京站)过站区隧道施工安全监控分析
Safety Monitoring Analysis in Across-station Tunnel Construction of Nanjing Metro
-
线性扰动河流预报模型应用&南京站、镇江站潮水位预报
Application of linear perturbation model to tidal level forecasting
-
在南京站加挂了两节车厢。
Two extra carriages were joined on at Nanjing .
-
下一站,南京站站到了,有下车的乘客请准备下车。
Next station is Nanjing railway station , please be ready for getting off .
-
南京站斜拉索锚固节点模型试验
Experimental Study on Model Test of Anchoring Joint of Stay Cable for Nanjing Railway Station
-
南京站实时潮位预报系统研制
Design and Implementation of the Real - Time Tidal Level Forecasting System for Nanjing Tidal Station
-
地铁南京站下穿南京铁路站场施工过程的三维数值模拟及工程应用
A 3-D Numerical Simulation and Application of Subway Tunnels beneath Existing Railway Lines in the Nanjing Railway Station
-
长江流域感潮河段潮位预报研究及在南京站的应用
The Study of Tidal Level Forecasting in Tidal Reach of the Changjiang River Catchment and Its Application at Nanjing Tidal Station
-
使用时程法计算了南京站网架在大震作用下的结构反应,计算结果已用于工程实际。
The reaction of Nanjing station structure during severer earthquake is calculated through time history method , and the result is satisfactory and useful to the design work .
-
针对南京站车站工程所处的地质和水文地质环境,介绍了工程结构自防水和外防水相结合的设计方案,并对工程采用的主要防水施工工艺作了详细介绍。
In view of geologic and hydrogeological condition around the stop , a waterproofing design which combines self-waterproofing of structure with outer waterproofing was adopted for the stop project . The article details main waterproofing methods used .
-
作为新中国第三代铁路客站的代表,南京站将现代技术、环境特色、城市文化、交通建筑空间特质在设计上高度融合,具有鲜明的时代特色。
As the representative work of the third genera - tion railway passenger station in China , Nanjing Station , marked with distinctive epochal character , highly integrates modern technique , environment features , urban culture and the spacial nature of transportation building into a whole .
-
赛间体能训练的负荷呈波浪式规律起伏,杭州站、上海站、南京站整体负荷节奏以小为主,结合间歇日出现中等负荷。
The loads of physical and condition training between the games are ups and downs like waves , the whole load rhythm in hangzhou , Shanghai and Nanjing stations is mainly " small " give priority to , combined with intermittent day appear " medium " load .
-
沈阳地铁南京街站基坑围护方案研究
On foundation pit supporting scheme of Nanjing street station in Shenyang subway
-
南京火车站旅客进站天桥钢结构设计
Steel Structure Design of Entrance Bridge of Nanjing Railway Station
-
南京火车站站前高架平台结构设计
Structure Design of the Elevated Platform in Front of NanJing Railway Station
-
南京火车站下地铁车站修建技术
Building Technology of Subway Station Under Nanjing Railway Station
-
都市耕作&南京地铁站:空间、场地、功能
Farmthecity : urban intervention Nanjing Metro Stations : space , site & program
-
上海轨道交通10号线南京东路站建筑设计实践
Architectural Design of East Nanjing Road Station of Shanghai Rail Transit Line 10
-
南京火车站主站房预应力钢屋盖采用桅杆斜拉索悬挂钢结构型式。
The prestressed steel roof of Nanjing railway station is suspended by cables .
-
新南京火车站
New Nanjing Railway Station
-
以南京火车站的站房结构为模型,使用一致激励和多点激励计算了结构在不同激励状况下的结构响应。
The seismic responses of structure of Nanjing Station are numerically simulated under the uniform excitation and the traveling-wave excitation .
-
南京火车站主站房主体结构采用混凝土结构,屋盖及幕墙支承体系采用钢结构。
The main building of Nanjing Railway Station is made up of concrete structure and the roof and curtain wall made up of steel structure .
-
结合南京火车站站前广场龙蟠路新建隧道工程,介绍了钻孔咬合桩的一般施工技术要求和主要控制措施。
In combination with the recently built tunnel engineering near the train station of Nanjing , some general technical requirements and major controlling measures were presented in the text .
-
分析了南京火车站站前广场老隧道出现渗漏的原因,探讨了老隧道改造工程中的防水技术,并对老隧道不同部位的防水技术改造作了介绍。
The article analyses the causes for leaking in the tunnel of Nanjing Railway Station Square , discusses about waterproofing techniques used in renovation of the tunnel and describes the ways of waterproofing in its different positions .
-
再通过结合南京火车站站前广场新建龙蟠路隧道深基坑监测,及对监测结果的深入分析,对深基坑工程的信息化施工提出了一些看法。
Combined with monitoring and analysis of the new Long Pan Road Tunnel deep foundation pit in the Nanjing depot piazza , some ideas about communication construction in deep foundation pit are put forward in the paper .
-
此车次将连接中国经济的两个发电站,整个车程当中只有南京一个站。
The train will connect two of China 's economic powerhouses with only one stop between them in Nanjing .