龙羊峡水库

  • 网络longyangxia reservoir
龙羊峡水库龙羊峡水库
  1. 通过龙羊峡水库合理运行方式研究,确定公伯峡水电站渡汛方案以及提高渡汛标准方案。

    Through studying Longyangxia reservoir reasonable operation mode , Gongboxia hydro-power station 's flood period scheme and improvement flood period standard scheme are established in this paper .

  2. 应用GPS技术对龙羊峡水库库岸滑坡监测的可行性分析

    A feasibility analysis of surveying the Longyang Xia reservior with the GPS Technique

  3. 龙羊峡水库地震诱发机制及危险性预测

    Trigger mechanism of reservoir-induced earthquakes and their risk prediction in the Longyang Gorge Reservoir Area

  4. 水库调度应重视经济效益&龙羊峡水库运行十年的分析与思考

    Reservoir dispatch and economic benefit

  5. 对1997年黄河上游地区龙羊峡水库人工增雨效果采用垂向混合产流模型进行效果评估。

    Vertical mixed model is used to evaluate the effect of artificial rain and verification of reliability in 1997 on upper reaches of the Yellow River .