双线船闸

  • double lock
双线船闸双线船闸
  1. 在长洲水利枢纽双线船闸工程施工中,由于当地汛期防汛任务重,汛期长等特点,对于船闸的左右两侧边坡的防冲刷提出了很高的要求。

    Superior scouring resistance capability is required for the bank slopes of double-lane shiplock of Changzhou Hydraulic Complex , due to local difficult flood protection and long flood period .

  2. 三峡工程双线五级船闸边墙变形初步分析

    Analysis on side wall deformation in TGP 's ship lock

  3. 三峡双线五级船闸开挖边坡锚固监测成果分析

    Analysis on monitoring results of anchoring in the excavated slope for TGP 's ship lock

  4. 三峡工程双线五级船闸高边坡预应力锚索监测成果分析

    Analysis on monitoring of pre-stressed anchor cable at high slope of TGP 's ship lock

  5. 三峡工程双线五级船闸二期工程主体段施工爆破振动监测

    Construction blasting vibration monitoring for the main part of the second stage of the dual-way five-step ship lock at Three Gorges Project

  6. 三峡双线五级船闸完建工程是三峡三期工程建设的重要组成部分。

    The construction completion project of the Three Gorges two-way five-step ship lock is an important component of the Three Gorges Phase III project construction .

  7. 本文对三峡双线五级船闸边坡的锚杆锚固受力状态进行了分析。

    In this paper , the mechanical conditions of anchors in the excavated slope at the TGP double - line five - grade ship lock s are analyzed .

  8. 介绍了三峡水利枢纽双线五级船闸人字闸门主要技术参数、技术特点和安装工艺,建立了闸门安装测量质量控制网点。

    This paper introduced was main technology parameter , technology characteristic and installation process of the miter gate of double line 5 class navigation in the Three Gorges Project .

  9. 双线五级船闸高边坡岩体声发射监测技术的应用取得了良好的效果,为今后其它工程高边坡岩体声发射监测积累了经验。

    The rock mass acoustic emission monitoring techniques of ship lock has got good effect , so it provides experiences for other projects on rock mass acoustic emission monitoring of high slope .

  10. 双线五级船闸高边坡的锚杆对边坡的支护加固效果较好,实施后边坡的变形扩展得到了控制,边坡整体是稳定的。

    The anchor rod in the high excavated slope can stabilize the slope very well , the deformation of the slope is restricted after installing these anchor , and the overall slope is stable .

  11. 本文介绍了双线五级船闸高边坡岩体声发射监测技术的应用情况,并对声发射监测成果进行了初步分析。

    The paper introduces the application of rock mass acoustic emission techniques on high slope of TGP double - line five - grade ship lock , and the preliminary analysis on the rock mass acoustic emission result .

  12. 三峡工程双线五级船闸深层岩体变形监测成果表明,船闸开挖引起的岩体垂直变形表现为回弹,最大回弹变形10.39mm;

    Deep rock mass deformation monitoring of TGP 's double-line five-grade ship lock shows that the rock mass vertical deformation , caused by the ship lock excavation , presents rebound , the maximum rebound deformation is 10.39 mm ;

  13. 三峡双线五级连续船闸工程技术研究

    Technology research about double-way and five-step continuous ship locks of Three Gorges Project

  14. 三峡水利枢纽双线连续五级船闸模型试验控制及数据采集系统的应用

    Application of system that control and datas collect on the models experiment for double-line continuous five class gorges locks