东莞水道

东莞水道东莞水道
  1. 东莞水道特大桥无支架缆索吊装系统设计

    The design on cable - hoisting erection system without supporting frame of the extra - large bridge on Dongguan watercourse

  2. 采用双重非线性方法,分析了东莞水道特大桥结构受力全过程和面内极限承载力。

    Dual none-linearity finite element method is used to analysis the whole behavior and ultimate load-carrying capacity in plane of Dongguan Shuidao Bridge .

  3. 以东莞律涌水道大桥为研究对象,在桥上埋置温度和应力传感器来测量其由于早期收缩产生的应力值,并对其进行研究分析。

    Take Dongguan Lv Yong long waterway bridge as the research object , and does research on buried temperature and stress sensors which are to measure stress value of the early contraction .

  4. 东莞西五环路水道特大桥钢管拱施工方案比选

    Selection of construction schemes for the steel tubular arch of a super large bridge in Dongguan