timebox
-
This forces the team to try to plan for the exact work expected in a given timebox .
这迫使团队试图计划将工作精确地放入一个给定的时间框内。
-
An iteration is the second level timebox .
迭代是第二级的时间单元,长度一般为1到4周。
-
We choose to vary the length of the timebox so we can practice getting to done .
我们选取不同长度的时间盒,这样就能确保完成所有的工作。
-
That increment is designed , coded , and tested within the timebox of the iteration .
在每次迭代时,增量的设计,编码和测试。
-
And every day is the most fine-grained timebox , the team gets together in a stand-up meeting to share project status and problems .
工作日是最细粒度的时间单元,团队每天在站立会议上聚集在一起交流项目的状态和问题。
-
A Construction iteration is a timebox , at the end of which we have working software which implements the highest priority requirements to date .
构建迭代是一个时间段,在其末尾,我们会得到实现迄今最高优先级需求的工作产品。
-
Working with the timebox constraint also helps in managing the risk , since you would not be building too much which would be difficult to throw away .
工作于时间盒的约束下还有助于管理风险,因为你不会一直去构建太多很难丢弃的东西。
-
He explained to me that the whole concept of overlapping iterations doesn 't make sense if you define an iteration as a " timebox " in addition to a set of objectives .
他向我解释说,如果您将迭代定义为一个没有目标的“时间框”,那么重叠迭代的整个概念就没有意义了。