projet
- 网络计划;草案;计划书;设计;计画
-
Research on Managed Printing Solution Based on Projet Cost Management
基于项目成本管理的文印整合管理研究
-
The Problems and Suggestions of the Cost of Public Project Construction Projet Investment Decision-making at Present
当前公共工程建设项目投资决策中造价存在的问题及建议
-
Development Community Medical and Health Care Is a Reform Projet Which Spans Two Centuries
发展社区医疗卫生保健是一项跨世纪的改革工程
-
Click this link to manage projet documents for the selected project
单击此链接可管理所选项目的项目文档
-
Study on Projet Management Applied in Appraisal Firms
项目管理在评估事务所的应用研究
-
The another projet was conducted to illustrate the stability of alcohol in stored blood and urine .
另一组实验考察了血、尿样品保存时乙醇的稳定性。
-
A Optimal Model on Planting Struct of Stock and Space-Time in Ecology Projet of Energy Sysetem
能源系统生态工程种植业种群时空结构优化模型
-
The analysis of well pouring water test of high-pouring waterproof wall in the projet of making the fenhe river beautiful in Taiyuan
太原汾河美化工程高喷防渗墙围井注水试验分析
-
Alton projet managers make frequent trips to China several times a year to oversee the manufacturing process for our clients , in our factories .
欧圣的项目经理每年需要经常来中国为我们的客户来视察我们制造商的工艺和生产水平。
-
Based on the introduction of match filtering , a method of simulation focusing on the actual echo under pulse compression and the results are given combining with the projet practice .
在介绍匹配滤波工作原理的基础上,结合工程实际,给出了实际目标回波脉压的仿真方法及所能达到的性能指标。
-
It may not be always true that the more effort and money you put into a projet , the more competent employees the trainees will be .
对培训项目投入的精力和资金越多,参训人员就越有能力,这种说法并不总是对的。
-
PFI ( Private Finance Initiative ) is a new mode in public infrastructure project nowadays . It can make the investors of the public infrastructure projet pluralized and iget over some disadvantages of the traditional mode .
PFI(PrivateFinanceInitiative)是目前国际上基础设施建设的一种新型模式,它可以实现基础设施建设项目投资主体的多元化,并在一定程度上克服了传统基础设施建设中的弊端。
-
Through hydraulic model test , this paper presents the hydraulics study results on overflow arch dam of Jinxi Hydroelectric Station , and puts forward an optimum configuration of overflow weir and subsidiary dam height for satisfying projet requests .
通过室内物理模型,对金溪一级电站溢洪道水力学问题进行试验研究,提出了满足工程要求的较优的溢流堰体型和二道坝高度。
-
During the power-house foundation of the Three Gorges projet , a 40 ~ 80 m high steep slope will be formed on downstream side of the damtoe rock monolith where large low dip angle joints constitute potential sliding surface of the dam foundation .
三峡工程厂房基坑开挖中,大部分坝段坝趾下游形成高达10~80m的临空陡坡,其中部分地段长大缓倾角结构面较发育,与临空面组合构成坝基潜在滑移面。